Patten-Sherman Multi-Use Trail
Rail-trail in Maine
Runs through Patten, Crystal and Sherman · Penobscot and Aroostook counties
Conditions now
Loading the weather near Patten…
Forecast by the National Weather Service for Patten · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Patten–Sherman Multi-Use Trail is an unpaved rail trail in northern Maine on the former railroad spur between Patten and Sherman. TrailLink, which calls it the Sherman to Patten Trail, describes the corridor as a former Bangor and Aroostook Railroad spur off the main line from Bangor through Millinocket to Houlton, part of the corridor the State of Maine acquired north of Millinocket. The branch was built as the Patten and Sherman Railroad: a bill before the Maine Legislature in March 1901 would have ratified the company's bonds, secured by a mortgage dated January 1, 1901, and its lease of the line to the Bangor and Aroostook Railroad Company. A 1919 timetable lists Bangor and Aroostook trains between Patten and Sherman; by June 1936 the company's Patten–Sherman service was listed as a bus route.
TrailLink gives the trail as 4.5 miles of an approximately 7-mile corridor between Patten and Sherman; the mapped trail runs about 5.5 miles south from Patten. The Sherman station stood in Stacyville. There is no access at the Sherman end, where the spur joined the main line. In Patten, the trail is reached at Potato Row and at Sherman Street south of town.
The surface is stone and gravel. TrailLink lists mountain biking, ATV riding, snowmobiling, horseback riding, walking and cross-country skiing, and notes side trails off the corridor for snowmobile and ATV riders. Wetlands adjoin the trail in several places. Beavers sometimes block drainage culverts and flood the railbed near the wetlands; local clubs that help maintain the trail clear the blockages.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
56% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Millinocket Municipal Airport, 39.8 km from the trail's middle, 26 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 25 28 38 51 65 74 79 78 69 56 42 31 Low °F 6 7 18 30 42 52 57 55 47 36 27 15 Precipitation, in 2.7 2.1 3 3.5 3.4 4.2 4.2 3.8 3.6 4.5 4.1 3.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1940 Sherman sheet (1:62,500); the 1942 Sherman sheet (1:62,500) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/Maine
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- An Act to ratify the lease of the Patten and Sherman Railroad to the Bangor and Aroostook Railroad Company, Senate No. 101 (1901) — Maine State Law and Legislative Reference Library · organization · checked Oct 13, 2026 Supports: Patten and Sherman Railroad Company bonds and mortgage dated January 1, 1901, lease to the Bangor and Aroostook Railroad Company, reported in the Senate March 7, 1901
- Patten — Nashua City Station Railroad History · organization · checked Oct 13, 2026 Supports: 1919 timetable with Bangor and Aroostook trains between Patten and Sherman
- Patten and Sherman — Nashua City Station Railroad History · organization · checked Oct 13, 2026 Supports: Bangor and Aroostook Patten–Sherman bus service in the June 22, 1936 timetable; Sherman station in Stacyville
- Sherman to Patten Trail — TrailLink · web · checked Oct 13, 2026 Supports: name Sherman to Patten Trail, former Bangor and Aroostook spur off the Bangor–Millinocket–Houlton main line, state acquisition of the corridor north of Millinocket, 4.5 miles of an approximately 7-mile corridor, no access at the Sherman end where the spur joined the main line, access at Potato Row and Sherman Street in Patten, stone and gravel surface, listed activities, side trails, wetlands, beaver-blocked culverts cleared by local clubs
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.