States › Missouri

Paved Bicycle Trail

Greenway in Missouri

Runs through Park Hills · St. Francois County

Conditions now

Loading the weather near Park Hills…

Forecast by the National Weather Service for Park Hills · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
14.3 mi 23.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Blankshire Trailhead mile 0 · restrooms directions to Blankshire Trailhead
  2. Harris Branch Trailhead mile 2.9 · restrooms directions to Harris Branch Trailhead
  3. MO Mines SHS Trailhead mile 5.2 directions to MO Mines SHS Trailhead
  4. Donnelly-Lamear Trailhead mile 8 directions to Donnelly-Lamear Trailhead
  5. Lakeview Trail mile 11.5 directions to Lakeview Trail
  6. Galena Trail mile 11.6 · restrooms directions to Galena Trail
  7. Pim Day-Use Trailhead mile 11.6 directions to Pim Day-Use Trailhead
  8. Farmington Trailhead directions to Farmington Trailhead
Gfp-missouri-babbler-state-park-bike-trail (opens in a new tab)
Gfp-missouri-babbler-state-park-bike-trail · Photo: Yinan Chen · Public Domain · Wikimedia Commons

About this trail

Paved Bicycle Trail is the name Missouri State Parks gives to paved paths in several of its parks. This record covers the one in St. Joe State Park at Park Hills, about 14 miles of mapped path, which Missouri State Parks manages. The paths of the same name in Dr. Edmund A. Babler Memorial State Park near Wildwood, Sam A. Baker State Park near Patterson and Montauk State Park near Salem are separate and many miles away, and are no longer part of this record.

The St. Joe path is the main riding trail: an 11.0-mile paved and concrete loop, blazed yellow and open to hiking and biking, in a park in the Old Lead Belt that is one of two off-road vehicle parks in the state system. A 3.75-mile section is wheelchair accessible, reached from the Blankshire and Harris Branch trailheads on the park's main loop. Some sections climb grades steeper than 10 percent or run beside drop-offs, and the path gives glimpses of the off-road vehicle area. Starting from trailheads at the Pim Day-Use Area, Missouri Mines State Historic Site or Farmington makes a round trip of 12.25 to 14.50 miles, and the Donnelly-LaMear Trailhead off Highway 67 at the Fairgrounds Drive exit also reaches the path.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

56% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Farmington, 8.5 km from the trail's middle, 43 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F434858697785888881705746
Low °F232634445463676556453426
Precipitation, in2.62.83.85.35.53.54.33.83.23.34.23
Snow, in2.72.1100000000.12.8
Old maps

USGS topographic maps of the trail's middle go back to the 1905 Bonneterre sheet (1:62,500); the 1958 Flat River sheet (1:24,000) shows the area at mid-century. Browse all 15 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Paved Bicycle Trail, St. Joe State Park (trail details) — Missouri State Parks · web · checked Oct 15, 2026
    Supports: 11.0-mile paved/concrete loop, yellow blazes, hiking and biking, 3.75-mile accessible section, Blankshire and Harris Branch trailheads, grades over 10 percent and drop-offs, views of ORV area, Pim Day-Use, Missouri Mines and Farmington trailheads with round-trip distances
  3. St. Joe State Park — Missouri State Parks · web · checked Oct 15, 2026
    Supports: Old Lead Belt, one of two ORV parks, Donnelly-LaMear Trailhead off Highway 67 at Fairgrounds Drive with access to the paved bicycle trail, Park Hills address
  4. Dr. Edmund A. Babler Memorial State Park — Missouri State Parks · web · checked Oct 15, 2026
    Supports: Wildwood address
  5. Sam A. Baker State Park — Missouri State Parks · web · checked Oct 15, 2026
    Supports: Patterson address
  6. Montauk State Park — Missouri State Parks · web · checked Oct 15, 2026
    Supports: Salem address
  7. Paved Bicycle Trail (way 864225040, St. Joe State Park) — OpenStreetMap contributors · web · checked Oct 15, 2026
    Supports: the same-name path in St. Joe State Park, about 14 miles mapped

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.