States › Wisconsin

Peace Trail

Rail-trail in Wisconsin · OpenStreetMap relation

Runs through Janesville, Town of Rock (Rock County), Town of Beloit and Beloit · Rock County

Conditions now

Loading the weather near Janesville…

Forecast by the National Weather Service for Janesville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
11.7 mi 18.8 km1
On former railbed
4.0 mi 34%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Riverside Street mile 0.2 directions to trailhead 1
  2. Parking at Afton Road mile 2 directions to trailhead 2
  3. Parking at Peace Park Road mile 2.3 · restrooms directions to trailhead 3
  4. Parking at County Highway D mile 2.7 directions to trailhead 4
Janesville, along the trail (opens in a new tab)
Janesville, along the trail · Photo: Jeramey Jannene (Grassferry49) · CC BY-SA 2.5 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Peace Trail is a paved multi-use trail of about 12 miles in Rock County, Wisconsin, between Janesville and Big Hill Park on the northern edge of Beloit, following the Rock River and an active rail line. The Rock Trail Coalition, a local advocacy group, describes it as a regional bicycling link meant to connect the Glacial River Trail through Rock County to the northern Illinois trail system. The project took more than two decades. The coalition cleared and roughed in sections, Rock County surfaced the southern stretches with crushed limestone in 2016 and 2018, and the City of Beloit built an asphalt section through Big Hill Park in 2017; the coalition dates the completed route from Janesville to the park to 2018.

The northern end is near South Jackson and Riverside streets in Janesville, where the trail leaves the Ice Age National Scenic Trail under an arch reading "Peace" and "Unity." It runs south along the river, with a short spur through Rockport Park, through Afton to Big Hill Park, a wooded 197-acre park with parking, restrooms and an environmental center. Three short stretches use roads, in Afton, on Duggan Road and on Walters Road. Parking is at the Fisher Creek lot near County Highway D (Afton Road) and West Rockport Park Drive, in Rockport Park, at the end of Tripp Road beside the Janesville wastewater plant, and in Big Hill Park. Beyond the park, reaching Beloit means about a mile on a bike lane beside a busy county road; a side path along Afton Road is planned.

In 2022 Rock County agreed to use nearly $90,000 in excess sales tax and American Transmission Company funds to close the last funding gap for paving the trail. Recent TrailLink user reviews describe the route as paved from Big Hill Park to Janesville, with cracked asphalt on the first few miles out of Janesville.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Afton - Janesville Wwtp, 1 km from the trail's middle, 5 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F283245587080838275624634
Low °F121525364858626051402818
Precipitation, in1.61.62.13.64.154.24.33.732.31.9
Snow, in10.810.14.11.3000000.22.47.7
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Janesville sheet (1:62,500); the 1961 Janesville West sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 5977225, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. The Peace Trail | Rock Trail Coalition · organization · checked Oct 15, 2026
    Supports: vision connecting the Glacial River Trail through Rock County to the northern Illinois trail system; coalition clearing and roughing in 2015 and 2017; Rock County crushed-limestone surfacing 2016 and 2018 (Bass Creek Road to Walters Road); City of Beloit asphalt through Big Hill Park 2017; completed from Janesville to Big Hill Park in 2018
  3. 2022 Project Highlight - Peace Trail - Wisconsin Bike Fed · organization · checked Oct 15, 2026
    Supports: in the works for over two decades; connect Beloit and Janesville; Rock County agreed to provide the final funding in 2022
  4. Rock County Funds Final Peace Trail Link from Janesville to Beloit - Rock County Development Alliance · web · checked Oct 15, 2026
    Supports: county plan to finish paving the Peace Trail; nearly $90,000 in excess sales tax and American Transmission Company funds to fill the final funding gap
  5. Peace Trail | Wisconsin Trails | TrailLink · web · checked Oct 15, 2026
    Supports: about 12 miles; paved; parallels the Rock River and an active rail line; northern end at the Ice Age National Scenic Trail near S. Jackson and Riverside streets with Peace/Unity arch; Rockport Park spur; through Afton to Big Hill Park (197 acres, parking, restrooms, environmental center); road sections in Afton, Duggan Road, Walters Road; parking at Tripp Road, Fisher Creek lot, Rockport Park; mile on a county-road bike lane to Beloit and planned Afton Road side path; user reviews on paving and cracked asphalt

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.