States › Indiana

Pennsy Greenway

Rail-trail in Indiana, crossing into Illinois · OpenStreetMap relation

Runs through Calumet City (IL), Lansing (IL), Munster and Schererville · Cook County (IL) and Lake County

Conditions now

Loading the weather near Schererville…

Forecast by the National Weather Service for Schererville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Pennsy Greenway is a rail trail in the Chicago metropolitan area running from Lansing, Illinois to Schererville, Indiana. The trail runs on the former Penn Central Railway, and is currently incomplete, but is paved at segments in Lansing, Munster, Dyer, Schererville, and Crown Point. The trail is paved through these segments at a total of 12.5 miles, and the trail is planned to extend for a total of 15 miles.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Official website

Length
14.1 mi 22.7 km1
On former railbed
8.1 mi 58%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Rohrman Road mile 2.4 directions to trailhead 1
  2. Parking at Rohrman Road mile 2.5 directions to trailhead 2
  3. Parking at Junction Avenue mile 4.6 directions to trailhead 3
  4. Parking at North Centennial Drive mile 8.9 directions to trailhead 4
  5. Parking at Fisher Street mile 10.1 directions to trailhead 5
  6. Parking at Lake Street mile 11.8 · restrooms directions to trailhead 6
  7. Parking at Ridge Road mile 11.8 · restrooms directions to trailhead 7
  8. Parking at Henry Street mile 11.9 · restrooms directions to trailhead 8
  9. Parking at Lake Street mile 11.9 · restrooms directions to trailhead 9
  10. Parking at Randolph Street mile 11.9 · restrooms directions to trailhead 10
  11. Parking at Roy Street mile 12 directions to trailhead 11
  12. Parking at Roy Street mile 12 directions to trailhead 12
  13. Parking at Ridge Road mile 12 · restrooms directions to trailhead 13
  14. Parking at Adams Street mile 12.3 directions to trailhead 14

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Pennsy Greenway (opens in a new tab)
Photo: tnugent · CC BY-SA 4.0 · Mapillary

About this trail

The Pennsy Greenway is a paved rail-trail in the southern Chicago suburbs that crosses the Illinois-Indiana state line, running from Calumet City and Lansing, Illinois, through Munster and Schererville to Clark Road at Crown Point, Indiana. It follows the former Penn Central railway. The trail was completed piece by piece over about a decade by the municipalities along the route, with federal transportation grants and state money; the Town of Schererville and the Lake County Parks Department built the newest section. Length figures differ: the Indiana Department of Natural Resources put the total at 12.5 miles after the 2023 extension, while Rails to Trails Conservancy gives 14.5 miles.

The northern end is at 159th Street and River Oaks Drive in Calumet City, where the Burnham Greenway ends at the eastern edge of the Forest Preserve District of Cook County's Green Lake Woods. The trail passes under Interstate 80/94 and runs southeast through residential neighborhoods to just past the state line, where it meets Lake County's Monon Trail between Munster and Hammond. In Indiana it continues past Centennial Park, Munster's largest park, then through Schererville to Rohrman Park and on to Clark Road. TrailLink lists parking at Green Lake Woods, Centennial Park, Plum Creek Park and Redar Memorial Park in Schererville, and Rohrman Park.

The fourth and newest segment is a 2.33-mile asphalt extension southeast from Rohrman Park to Clark Road, built with a $2.9 million Next Level Trails grant awarded in 2019; 1.5 miles of it opened on May 31, 2023, with the remaining 0.83 mile due that June. The greenway is part of the Great American Rail-Trail and the American Discovery Trail, and at its southern end the Erie Lackawanna Trail lies about a mile away. Local parks departments host a Pennsy Bike Ride on the trail each August.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

The Federal Railroad Administration's national rail map marks 15% of this route as an abandoned line with the track removed and 17% as a trail on former railroad right-of-way, naming the line Crown Point It and Hartsdale It.

Shade

22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Park Forest, 16.7 km from the trail's middle, 25 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313546597180848276634836
Low °F151828384959646255423122
Precipitation, in2.52.12.644.64.94.743.43.632.5
Snow, in10.27.54.90.5000000.20.94
Old maps

USGS topographic maps of the trail's middle go back to the 1900 Toleston sheet (1:62,500); the 1953 Highland sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in 2024 reported South Shore line work closing the Monon near the Little Calumet River and a gap between it and the Pennsy; one rider in July 2025 said the bridge was in place. r/chibike, Sep 2024 · r/chibike, Sep 2024 · r/chibike, Jul 2025
  • Riders in 2024 and 2025 linked the Pennsy with the Erie Lackawanna, Monon, Burnham and Marquette trails via a few street stretches, mostly residential; one loop was put near 44 miles. r/chibike, Sep 2024 · r/chibike, Sep 2024 · r/chibike, Jul 2025 · r/chibike, Aug 2025
  • One rider in September 2024 said the Pennsy was complete except about an eighth of a mile near its start, passable through Centennial Park; another in March 2025 said parts were unfinished but accessible. r/chibike, Sep 2024 · r/nwi, Mar 2025
  • Riders in 2024 and 2025 flagged the Calumet Avenue crossing in Munster; one said Pennsy sections were not yet joined across the railroad tracks there, another found crossing near 45th Avenue very stressful. r/chibike, Sep 2024 · r/nwi, Mar 2025
5 Reddit threads about this trail, Sep 2024 to Aug 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 4276615, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Pennsy Greenway”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q22096426, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Official trail website · Official site · checked Oct 31, 2026
  5. Next Level Trails celebrates Schererville trail project — State of Indiana (Indiana DNR release, May 31, 2023) · government source · checked Oct 15, 2026
    Supports: Schererville and Lake County Parks Department segment; 2.33-mile asphalt extension from Rohrman Park southeast to Clark Road; 1.5 miles open May 31, 2023 and 0.83 mile due in June; total 12.5 miles; $2.9 million Next Level Trails grant awarded in 2019; part of the Great American Rail-Trail and the American Discovery Trail
  6. Pennsy Greenway — Wikipedia · organization · checked Oct 15, 2026
    Supports: rail trail in the Chicago metropolitan area from Lansing, Illinois, into Indiana on the former Penn Central railway; segments in Lansing, Munster, Dyer, Schererville and Crown Point
  7. Illinois and Indiana's Pennsy Greenway — Rails to Trails Conservancy (Trail of the Month, August 2023) · organization · checked Oct 15, 2026
    Supports: 14.5 miles; former Penn Central route; built piece by piece over a decade by municipalities with federal transportation grants and state funding; endpoints 159th Street/River Oaks Drive in Calumet City and Clark Road in Crown Point; Burnham Greenway and Green Lake Woods; passes under I-94; meets Lake County's Monon Trail just over the border; Centennial Park as Munster's largest park; fourth segment from Rohrman Park to Clark Road; Pennsy Bike Ride each August; Erie Lackawanna Trail about a mile away
  8. Pennsy Greenway — TrailLink (Rails to Trails Conservancy) · web · checked Oct 15, 2026
    Supports: trail begins at the southern end of the Burnham Greenway on the eastern edge of the Forest Preserve District of Cook County's Green Lake Woods; crosses under I-80/94; link with the Monon Trail at Fisher Street; parking at Green Lake Woods, Centennial Park, Plum Creek Park, Redar Memorial Park and Rohrman Park

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.