States › Illinois

Perryville Path

Greenway in Illinois

Runs through Loves Park and Rockford · Winnebago County

Conditions now

Loading the weather near Loves Park…

Forecast by the National Weather Service for Loves Park · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
7.7 mi 12.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Vistagreen Way mile 1.8 directions to trailhead 1
  2. Parking at Vistagreen Way mile 1.9 directions to trailhead 2
  3. Parking at Spring Creek Road mile 2 directions to trailhead 3
  4. Parking at North Perryville Road mile 2.1 directions to trailhead 4
  5. Parking at North Perryville Road mile 2.2 directions to trailhead 5
  6. Parking at Broadcast Parkway mile 4.1 directions to trailhead 6
  7. Parking at Marsh Hawk Drive mile 4.2 directions to trailhead 7
  8. Parking at North Perryville Road mile 4.2 directions to trailhead 8
Gfp-illinois-rock-cut-state-park-curving-trail (opens in a new tab)
Gfp-illinois-rock-cut-state-park-curving-trail · Photo: Yinan Chen · Public Domain · Wikimedia Commons

About this trail

The Perryville Path, which Winnebago County calls its Perryville Bike & Recreation Path, is a 10-foot-wide asphalt shared-use path along Perryville Road in Winnebago County, Illinois. The Winnebago County Highway Department has extended it with state grants. The first section was built in 1994 with a federal grant, matching money from Winnebago County and the support of developer Sunil Puri and attorney Jim Keeling.

In April 2023 the county described the existing path as 9 miles long, while local press put it at about 15 miles from Machesney Park to Rockford, with connections into Rock Cut State Park and Rock Valley College; the Cherry Valley Path begins just south of it. This record maps about 7.7 miles of the path.

Two earlier Illinois Transportation Enhancement Program (ITEP) grants paid for an extension from Hart Road to IL 173, built in 2022, and another from Anjali Way to Willowbrook Lane, scheduled for the summer and fall of 2023. In 2023 the county received a further ITEP grant of $553,500 from the Illinois Department of Transportation for a 0.75-mile extension from Willowbrook Lane to McDonald Road, connecting to the Village of Roscoe's Porter Park, with construction then expected in 2025.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

15% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Rockford Gtr Rockford Airport, 16.9 km from the trail's middle, 51 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F293346607181848275624734
Low °F141828385060646254423020
Precipitation, in1.61.62.43.84.25.23.84.23.62.62.31.9
Snow, in10.98.54.90.9000000.22.39.4
Old maps

USGS topographic maps of the trail's middle go back to the 1918 Belvidere sheet (1:62,500); the 1944 Belvidere sheet (1:62,500) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Highway Department to receive ITEP grant for Perryville Path improvements — Winnebago County (April 21, 2023) · government source · checked Oct 15, 2026
    Supports: Perryville Bike & Recreation Path of the Winnebago County Highway Department; existing 9-mile, 10-foot-wide asphalt shared-use path along Perryville Road; $553,500 ITEP grant from IDOT for a 0.75-mile extension from Willowbrook Lane to McDonald Road connecting to the Village of Roscoe's Porter Park, construction expected in 2025; earlier ITEP grants: Hart Road to IL 173 in 2022, Anjali Way to Willowbrook Lane in summer/fall 2023
  3. Perryville recreation path to extend north to Roscoe's Porter Park — Rock River Current (April 24, 2023) · web · checked Oct 15, 2026
    Supports: first section built in 1994 with a federal grant, Winnebago County matching dollars and support of developer Sunil Puri and attorney Jim Keeling; path about 15 miles from Machesney Park to Rockford; connections into Rock Cut State Park and Rock Valley College; Cherry Valley Path just south

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.