States › Wisconsin

Pheasant Branch Conservancy West Trail

Greenway in Wisconsin · OpenStreetMap relation

Runs through Middleton · Dane County

Conditions now

Loading the weather near Middleton…

Forecast by the National Weather Service for Middleton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.4 mi 2.2 km1
Surface
Crushed stone1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Prairie Glade Road mile 0.2 directions to trailhead 1
  2. Parking at Pheasant Branch Road mile 1 directions to trailhead 2
Boardwalk section of the Pheasant Branch Conservancy West Trail (opens in a new tab)
Boardwalk section of the Pheasant Branch Conservancy West Trail · Photo: chris.rycroft · CC BY 4.0 · Flickr

About this trail

The Pheasant Branch Conservancy West Trail is a crushed-stone path inside Pheasant Branch Conservancy in Middleton, Wisconsin. The 682-acre conservancy is owned by Dane County Parks, the Wisconsin Department of Natural Resources and the City of Middleton; Dane County Parks manages its own 259-acre unit and a 60-acre DNR unit, and Middleton manages the remaining 363 acres. The Friends of Pheasant Branch Conservancy, a volunteer group formed in 1995, works on prairie restoration and plantings there. Dane County lists an unpaved bicycle and pedestrian trail among the park's amenities.

This record maps about 1.4 miles of the path. A bicycle-route guide describes the conservancy's loop as about 3.5 miles of narrow crushed stone with wooden boardwalks in low areas.

The paved Pheasant Branch Creek Corridor Trail, mapped as a separate record, ends at County Highway M (Century Avenue) and crosses into the conservancy there, so the two paths meet at the conservancy's edge.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

56% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to May and July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Uw Arboretum - Madison, 9.3 km from the trail's middle, 3 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F283244576978828174614633
Low °F111425364757615951392818
Precipitation, in1.71.72.34.24.55.74.74.13.932.31.9
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Madison sheet (1:62,500); the 1959 Madison West sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 7212362, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Pheasant Branch Conservancy - Friends of Pheasant Branch Conservancy · organization · checked Oct 18, 2026
    Supports: Friends group began 1995, prairie restoration, 682-acre conservancy in Middleton
  3. Pheasant Branch Conservancy - Dane County Parks · web · checked Oct 18, 2026
    Supports: 682 acres, ownership split, managed units, unpaved bicycle/pedestrian trail
  4. Pheasant Branch Conservancy - Wisconsin Bike Trails · web · checked Oct 18, 2026
    Supports: crushed-stone surface, about 3.5-mile loop, boardwalks, Century Avenue entry from the creek corridor trail
  5. OpenStreetMap · web · checked Oct 18, 2026
    Supports: mapped length, surface and location of the way(s)

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.