States › Iowa

Plywood Trail

Greenway in Iowa

Runs through Hinton and Sioux City · Plymouth and Woodbury counties

Conditions now

Loading the weather near Sioux City…

Forecast by the National Weather Service for Sioux City · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.6 mi 9.0 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Starview Drive mile 5.4 directions to trailhead 1
Sioux City, along the trail (opens in a new tab)
Sioux City, along the trail · Photo: Ammodramus · CC0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The PlyWood Trail is a bicycle and pedestrian trail being built in phases between Sioux City and Le Mars in northwest Iowa, through Hinton and Merrill and largely near U.S. Highway 75. It is named for the two counties it connects, Plymouth and Woodbury. The PlyWood Trail Foundation, a 501(c)(3) nonprofit, leads the project, which is funded with grants and private contributions; the finished trail is expected to run 18 to 19 miles and to cost at least $23 million. The section mapped here is the southern one, Phase 3, from Sioux City to Hinton.

Phase 3 is about 6 miles long. The Sioux City City Council approved its plans and contract in June 2024 at an estimated cost of just over $5.5 million. By March 2025 the foundation reported the trail complete from Sioux City to just beyond C-80 by the Ruhland Tree Farm, with a bridge finished south of Harness Road. In August 2026 Sioux City's parks and recreation director called the Sioux City–Hinton segment the largest trail project in Woodbury County's history and expected construction to finish by the end of that month; 46th Street between Floyd Boulevard and Highway 75 was closed for the work. The full connection is to follow the Riverfront Trail to Dace Avenue, Lewis Boulevard, 6th Street and the Floyd Trail to Outer Drive, then the levee to 46th Street and Highway 75 to Hinton; the link to 46th Street was awaiting an Army Corps of Engineers permit.

Phase 1, from Le Mars to Merrill along Highway 75, was open to riders by early 2025 and was completed in late 2025. The middle segment, Merrill to Hinton, is to be built last and still needed design work, fundraising and a highway overpass or underpass as of August 2026. The trail is open to cyclists, runners and walkers; motorized vehicles are not allowed.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Sioux City Gateway Airport, 21.5 km from the trail's middle, 9 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F303448617282858377634733
Low °F101526374959636151382515
Precipitation, in0.70.91.83.13.94.33.43.92.82.21.31
Snow, in7.78.75.72.3000000.83.27.6
Old maps

USGS topographic maps of the trail's middle go back to the 1955 Sioux City sheet (1:250,000); the 1964 James sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Plywood Trail – Connecting Siouxland Communities (PlyWood Trail Foundation) · web · checked Oct 15, 2026
    Supports: named after Plymouth and Woodbury counties; route from Le Mars through Merrill and Hinton into Sioux City parallel to Highway 75; foundation is a 501(c)(3) nonprofit
  3. Plywood Trail: Phase 3 construction resumes, road closure in effect — KTIV, August 5, 2026 · web · checked Oct 15, 2026
    Supports: 18 to 19 miles in all; Sioux City to Hinton about 6 miles, largest trail project in Woodbury County history; 46th Street closure; Army Corps of Engineers permit for the 46th Street link to the Floyd Trail; Phase 3 route through Sioux City; Phase 1 completed late last fall; Merrill–Hinton segment needs design, fundraising and a highway overpass or underpass; Phase 3 expected complete by end of August
  4. PlyWood Trail project is getting closer to completion — KTIV, March 6, 2025 · web · checked Oct 15, 2026
    Supports: Phase 1 (Le Mars to Merrill) open to the public with minor work left for spring 2025; Sioux City–Hinton trail complete just beyond C-80 by the Ruhland Tree Farm; bridge south of Harness Road; open to cyclists, runners and walkers, no motorized vehicles
  5. Sioux City City Council approves Phase 3 of PlyWood Trail — KTIV, June 4, 2024 · web · checked Oct 15, 2026
    Supports: council approval of Phase 3 plans and contract; estimated cost just over $5.5 million; funded by private contributions and grants
  6. Two PlyWood Trail segments could be done by spring — BikeIowa · web · checked Oct 15, 2026
    Supports: cost of at least $23 million funded with grants and private contributions; much of the trail near U.S. Highway 75; Merrill–Hinton segment to be finished last

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.