States › Delaware

Pomeroy and Newark Rail Trail

Rail-trail in Delaware · OpenStreetMap relation

Runs through Newark · New Castle County

Conditions now

Loading the weather near Newark…

Forecast by the National Weather Service for Newark · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.4 mi 5.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Creek Road mile 1.7 directions to trailhead 1
  2. Lot 10N mile 2.7 directions to Lot 10N
  3. Lot 9-1 mile 2.7 directions to Lot 9-1
  4. Newark Shopping Center Parking mile 3.3 directions to Newark Shopping Center Parking
  5. Parking at North Chapel Street mile 3.3 directions to trailhead 5
  6. Parking at Newark Shopping Center mile 3.3 directions to trailhead 6
  7. Parking at East Main Street mile 3.4 directions to trailhead 7
  8. Patrons Only mile 3.5 directions to Patrons Only
  9. Patrons Only mile 3.5 directions to Patrons Only
  10. Patrons Only mile 3.5 directions to Patrons Only
  11. Permit Only mile 3.5 directions to Permit Only
  12. Parking at Scholar Drive mile 3.6 directions to trailhead 12
  13. Parking at Scholar Drive mile 3.7 directions to trailhead 13
  14. Parking at Scholar Drive mile 3.8 directions to trailhead 14
  15. Lot 54 mile 3.9 directions to Lot 54
  16. Lot 3 mile 4 directions to Lot 3
  17. Lot 39 mile 4 directions to Lot 39
  18. Scene Shop Lot mile 4 directions to Scene Shop Lot
  19. UD Motor Pool Lot mile 4 directions to UD Motor Pool Lot
  20. Lot 3 mile 4.1 directions to Lot 3

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Recreation Trails database (NPS and American Trails).

Pomeroy and Newark Rail Trail north of Main Street.jpg (opens in a new tab)
Pomeroy and Newark Rail Trail north of Main Street.jpg · Photo: Dough4872 · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Pomeroy and Newark Rail Trail, sometimes called the Pomeroy Trail, is a paved, lighted rail-trail in Newark, Delaware, that runs north from the city into White Clay Creek State Park. The state's 2012 opening announcement called it two miles long; its National Recreation Trail listing, certified on May 29, 2013, gives 4.18 miles. The trail grew from the City of Newark's partnership with the Delaware Department of Transportation (DelDOT), Delaware State Parks, the University of Delaware and DART. Discussed since the 1990s and studied with DelDOT funding, it was built with $4.7 million from the Federal Highway Administration after DelDOT paid $2.6 million for the right-of-way in 2006. Construction began in late August 2011, and the trail opened in September 2012.

The trail follows the former Pomeroy and Newark Railroad, which ran from Pomeroy, Pennsylvania, on the Pennsylvania Railroad's Main Line, south to Newark. Predecessor companies completed the line in about 1873, and it took the Pomeroy and Newark name in a December 1881 merger. Passenger trains ended in September 1928, and freight abandonment began in 1936. In Pennsylvania, parts of the right-of-way carry the Charlie Bailey and Penndel trails in White Clay Creek Preserve.

The trail runs from Hopkins Road in White Clay Creek State Park south to the James F. Hall Trail in Newark, giving access to Main Street, the Newark Shopping Center and the University of Delaware's Laird Campus. The surface is mainly paved, and three kiosks describe the rail line's history. The trail was planned to link the James Hall Trail, the state park, Redd and Reservoir parks and the Middle Run Valley Natural Areas into more than 75 miles of connected trails.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

63% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Newark Ag Farm, 3.6 km from the trail's middle, 5 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F424654677684898779695747
Low °F252533425262666558463630
Precipitation, in3.42.94.33.73.644.844.943.44
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1898 Elkton sheet (1:62,500); the 1953 Newark West sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 12266874, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Officials celebrate Pomeroy and Newark Rail Trail opening — Delaware News · government source · checked Oct 14, 2026
    Supports: two miles; Pomeroy–Newark rail line; north through Newark into White Clay Creek State Park; partners; 1990s discussion, DelDOT feasibility study; FHWA $4.7 million; DelDOT $2.6 million right-of-way in 2006; construction from late August 2011; September 2012 opening; Main Street, Newark Shopping Center, Laird Campus; 75 miles of connected trails
  3. Pomeroy and Newark Rail Trail — National Recreation Trails database · organization · checked Oct 14, 2026
    Supports: NRT certification May 29, 2013; 4.18 miles; Hopkins Road to James F. Hall Trail; paved, lighted; three history kiosks
  4. Pomeroy and Newark Railroad — Wikipedia · organization · checked Oct 14, 2026
    Supports: route from Pomeroy on the PRR Main Line to Newark; completion about 1873; December 1881 merger; last passenger trains September 1928; freight abandonment from 1936; 'Pomeroy Trail' name; Charlie Bailey and Penndel trails in White Clay Creek Preserve

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.