States › Missouri

Prairie Creek Greenway

Greenway in Missouri

In Platte County

Conditions now

Loading the weather near Platte City…

Forecast by the National Weather Service for Platte City · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
4.4 mi 7.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Kentucky Avenue mile 0 directions to trailhead 1
  2. Parking at Sycamore Drive mile 1.7 directions to trailhead 2

Plan your visit

Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).

PrairieCreekAtPrairieCreekGreenway.jpg (opens in a new tab)
PrairieCreekAtPrairieCreekGreenway.jpg · Photo: SamuelNelsonGISP · CC0 · Wikimedia Commons

About this trail

The Prairie Creek Greenway is a paved trail just south of Platte City, Missouri, managed by Platte County Parks and Recreation. It is not a rail-trail. The county built it through partnerships with local developers, who donated land and construction services, and opened it on National Trails Day, June 3, 2006. The Platte County Landmark has described it as one of the county's earliest trail projects.

The county's description calls it a four-mile trail, while its trail listing gives a distance of 6.75 miles with an elevation gain of 78 feet and seven pedestrian bridges. It has two main trailheads, one in the Timber Park subdivision and one off Highway N at Prairie Creek Greenway Road, and pedestrian access from several subdivisions along the route. The trail is open daily from dawn to dusk. The county's plans for future phases include a 7.8-mile enclosed loop. In 2025 the Landmark reported that the county was buying five acres on the east side of Highway N, directly south of the Highway N trailhead, to extend the trail south and connect it to the Seven Bridges neighborhood through a planned trail connector, with a roundabout on Highway N for a pedestrian crossing. The line on this page comes from OpenStreetMap and covers about 4.4 miles.

The surface is asphalt. In April 2026 the county announced that it had contracted Superior Bowen to resurface the trail system, whose surface had reached the end of its service life. Starting on May 26, 2026, crews were to repave asphalt sections and repair bridge approaches in phases of about two weeks each, with temporary closures of the section under work.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

18% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Kansas City International Airport, 5.4 km from the trail's middle, 34 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F384455667584888779675442
Low °F202434445464686658463424
Precipitation, in1.21.52.445.35.24.64.243.221.6
Snow, in4.95.91.70.3000000.31.14
Old maps

USGS topographic maps of the trail's middle go back to the 1890 Kansas City sheet (1:125,000); the 1950 Platte City sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Prairie Creek Greenway — Platte County Parks & Recreation · web · checked Oct 15, 2026
    Supports: managed by Platte County Parks & Recreation; south of Platte City; four-mile trail built through developer donations of land and construction services; opened National Trails Day, June 3, 2006; trailheads in Timber Park subdivision and off N Highway; subdivision access; future 7.8-mile loop; dawn to dusk; 6.75 miles, 78 ft elevation gain, asphalt, 7 pedestrian bridges; maintenance project Phase I starting Tuesday, May 26, repaving asphalt and repairing bridge approaches, about 2 weeks per phase, temporary closures
  3. Sections of trail will close during resurfacing — The Platte County Landmark (April 20, 2026) · web · checked Oct 15, 2026
    Supports: one of Platte County's earliest trail projects; surface at end of service life; contract with Superior Bowen to resurface the trail system
  4. County wants to connect trail to Seven Bridges — The Platte County Landmark (February 26, 2025) · web · checked Oct 15, 2026
    Supports: purchase of five acres east of Hwy. N directly south of the existing trailhead at Prairie Creek Greenway Road; Seven Bridges Trail Connector; roundabout on Hwy. N for pedestrian access; plan to extend the trail south
  5. OpenStreetMap ways for this trail · web · checked Oct 15, 2026
    Supports: mapped line of about 4.4 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.