States › Wisconsin

Prairie Farms Trail

Greenway in Wisconsin

Runs through Pleasant Prairie · Kenosha County

Conditions now

Loading the weather near Pleasant Prairie…

Forecast by the National Weather Service for Pleasant Prairie · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.6 mi 2.5 km1
Surface
Crushed stone1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Prairie Farms Trail drawn on the 1958 USGS topographic map of Pleasant Prairie, Wisconsin
Then: the 1958 USGS Pleasant Prairie sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Prairie Farms Trail is a gravel path in Pleasant Prairie, Kenosha County, Wisconsin, running from Prairie Springs Park to Wilmot Road (County Highway C). It is owned by the Village of Pleasant Prairie and serves both as a recreational trail for running, biking and walking and as a maintenance path over a sewer relief line.

The village built the line after it retired the 73-1 and Sewer D treatment plants at the end of 2010 under its Lake Michigan return flow agreement, and the granular maintenance path was made the trail. It was built with recycled millings from 2011 roadwork in LakeView Corporate Park. A culvert installed in 2013 completed the connection at the north end, and the village held a ribbon cutting on October 12, 2013.

The trailhead is on the north side of Prairie Springs Park on Park Drive (93rd Place), with parking in the north ball field lots. A 2012 village notice said the path was planned to be paved once a culvert was in place; the village pages fetched do not say whether that happened.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

1% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Kenosha Regional Airport, 6.4 km from the trail's middle, 18 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F313545576979848275624837
Low °F161928374757626153433222
Precipitation, in1.21.123.63.53.73.43.63.42.921.5
Old maps

USGS topographic maps of the trail's middle go back to the 1892 Racine sheet (1:62,500); the 1958 Pleasant Prairie sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Prairie Farms Trail - Village of Pleasant Prairie · government source · checked Oct 17, 2026
    Supports: sewer relief line, dual purpose, millings, planned paving
  3. 10/14/2013 Prairie Farms Trail - Village of Pleasant Prairie · government source · checked Oct 17, 2026
    Supports: ribbon cutting, trailhead, parking, route, 2013 culvert

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.