Prairie Trail
Rail-trail in Idaho · OpenStreetMap relation
Runs through Post Falls and Coeur d'Alene · Kootenai County
Conditions now
Loading the weather near Coeur d'Alene…
Forecast by the National Weather Service for Coeur d'Alene · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at North Huetter Road mile 2 directions to trailhead 1
- Parking at Industrial Loop mile 2.9 directions to trailhead 2
- Parking at Engineer Street mile 3.1 directions to trailhead 3
- Parking at Engineer Street mile 3.1 directions to trailhead 4
- Parking at West Kathy Loop mile 3.3 directions to trailhead 5
- Parking at West Kathy Loop mile 3.3 directions to trailhead 6
- Parking at West Kathy Loop mile 3.3 directions to trailhead 7
- Parking at West Kathleen Avenue mile 3.5 directions to trailhead 8
- Parking at West Kathleen Avenue mile 3.5 directions to trailhead 9
- Parking at Saint Michelle Drive mile 3.7 directions to trailhead 10
- Parking at North Saint Michelle Drive mile 3.8 directions to trailhead 11
- Parking at West Kathleen Avenue mile 4 directions to trailhead 12
- Parking at Nursery Road mile 4.1 directions to trailhead 13
- Parking at Nursery Road mile 4.1 directions to trailhead 14
- Parking at Nursery Road mile 4.2 directions to trailhead 15
- Parking at West Fairway Drive mile 5 directions to trailhead 16
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Prairie Trail is a paved trail in Coeur d'Alene, Idaho, that the City of Coeur d'Alene describes as about 4 miles long, running northwest from Beebe Boulevard to Huetter Road. It links parks, schools, neighborhoods and businesses. The North Idaho Centennial Trail, a 24-mile paved trail through Kootenai County that passes through Coeur d'Alene and Post Falls, is the area's main trail.
According to the city, the trail was built in July 2008 through the work of the North Idaho Centennial Trail Foundation and the City of Coeur d'Alene. The city's Parks Department and the Foundation maintain it. The city's page also says that plans to extend the trail about another mile to Meyer Road are underway; whether that extension has been built could not be confirmed from the pages read. OpenStreetMap marks the route as paved, part of it as following a railroad corridor, and maps parking at several street crossings, including North Huetter Road, Industrial Loop and Engineer Street.
For questions about the trail, the city lists a trails contact telephone number of (208) 769-2266.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Coeur D'Alene, 6.1 km from the trail's middle, 44 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 36 41 48 56 66 72 83 83 74 58 44 36 Low °F 26 26 31 37 44 51 57 56 48 39 32 26 Precipitation, in 3.2 2.1 2.7 1.9 2.1 2.2 0.7 0.8 0.8 2 3.3 3.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1903 Rathdrum sheet (1:125,000); the 1957 Coeur D'Alene sheet (1:62,500) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesPrairie Trail — City of Coeur d'Alene Parks and Recreation
- RedditSearch Reddit: r/Idaho
Nearby trails
- North Idaho Centennial Trail within 0.2 mi · 18.8 mi, paved
- Karen Streeter Memorial Trail 3.8 mi away · 2.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9714166, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Prairie Trail — City of Coeur d'Alene, Idaho · organization · checked Oct 17, 2026 Supports: about 4 miles, Beebe Boulevard to Huetter Road, built July 2008, maintenance, planned extension to Meyer Road, trails contact number
- North Idaho Centennial Trail — Wikipedia · organization · checked Oct 17, 2026 Supports: 24-mile paved Centennial Trail through Kootenai County, Coeur d'Alene and Post Falls
- OpenStreetMap relation 9714166 — Prairie Trail · web · checked Oct 17, 2026 Supports: paved surface, railroad corridor, parking at Huetter Road, Industrial Loop and Engineer Street
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.