Princess Anne Road Multi-Use Path
Greenway in Virginia
Runs through Virginia Beach
Conditions now
Loading the weather near Virginia Beach…
Forecast by the National Weather Service for Virginia Beach · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Princess Anne Road mile 0 directions to trailhead 1
- Parking at Landstown Centre Way mile 3.6 directions to trailhead 2
- Parking at Princess Anne Road mile 3.6 directions to trailhead 3
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Princess Anne Road Multi-Use Path is a pair of paved sidepaths flanking Princess Anne Road in Virginia Beach, Virginia, built with the road's widening between Dam Neck Road and Nimmo Parkway; the paths on the two sides together account for the 3.7 miles mapped here. It does not follow a railroad. The City of Virginia Beach project, bid through the Commonwealth Transportation Board in 2010 and funded partly with federal stimulus money, widened about 2.1 miles of rural two-lane road to a four-lane divided highway and called for multi-use paths flanking both sides of the entire alignment. Construction began in October 2010, and the major work was completed in June 2014 at a cost of $61.4 million.
The mapped paths run southeast from Landstown Centre Way, near the Princess Anne Athletic Complex and the Landstown Commons shopping area, past the Virginia Beach National golf course to Nimmo Parkway at the Virginia Beach Municipal Center, for which the road is the main access.
The roadway also has wide shoulders for bicycle lanes. At Nimmo Parkway the path meets the Nimmo Parkway Multi-Use Path; the same construction program built a four-lane extension of Nimmo Parkway between Princess Anne and Holland roads.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
25% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to June and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Oceana Nas, 6.8 km from the trail's middle, 2 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 50 53 59 69 76 83 87 85 80 71 61 54 Low °F 32 33 39 48 56 66 70 69 64 53 42 35 Precipitation, in 3.2 2.8 3.6 3.4 3.6 4.2 5.8 5.1 4.5 4.2 3.1 3.3 Snow, in 2.2 0.8 0 0 0 0 0 0 0 0 0 0.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1907 Norfolk sheet (1:125,000); the 1955 Princess Anne sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Nimmo Parkway Multi-Use Path within 0.2 mi · 2.6 mi, paved
- Dam Neck Road Multi-Use Path 0.3 mi away · 5.3 mi, paved
- London Bridge Trail 1.9 mi away · 2.4 mi, paved
- Independence Boulevard Trail (Northern Section) 2.2 mi away · 1.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Bids, July 2010 CTB Meeting — Commonwealth Transportation Board (Virginia) · government source · checked Oct 14, 2026 Supports: City of Virginia Beach project widening about 2.1 miles of Princess Anne Road from two lanes to a four-lane divided road from just east of Dam Neck Road to Nimmo Parkway; multi-use paths flanking both sides of the entire alignment; adjacent Landstown Commons, Virginia Beach National golf course and Municipal Center; road is the main access to the Municipal Center; ARRA (stimulus) funding; awarded to Branscome, Inc.
- Your commute around southern Virginia Beach is about to change — WTKR News 3 (June 24, 2014) · web · checked Oct 14, 2026 Supports: Phase IV between Dam Neck Road and Nimmo Parkway; construction began October 2010; major work completed June 2014; $61.4 million; 2009 federal stimulus; wide shoulders for bike lanes; multi-use paths on both sides; Nimmo Parkway extension between Princess Anne and Holland roads
- Princess Anne Road Multi-Use Path ways — OpenStreetMap · web · checked Oct 14, 2026 Supports: mapped length and endpoints at Landstown Centre Way and Nimmo Parkway; Princess Anne Athletic Complex nearby; junction with the Nimmo Parkway Multi-Use Path
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.