Quarry Lake Trail
Greenway in Minnesota · OpenStreetMap relation
Runs through Shakopee · Scott County
Conditions now
Loading the weather near Shakopee…
Forecast by the National Weather Service for Shakopee · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Gateway Drive mile 1.3 directions to trailhead 1
- Parking at Gateway Drive mile 1.3 directions to trailhead 2
- Parking at Gateway Drive mile 1.3 directions to trailhead 3
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
Quarry Lake Trail is a paved path in Shakopee, Minnesota, running south from Quarry Lake Park to Gateway Drive. A press release dated November 7, 2014 from the Shakopee Mdewakanton Sioux Community reports that community and city officials cut the ribbon on the trail, which it calls a half-mile path. The release gives the project cost as $100,000, paid in part by a community grant, one of five Scott County trail projects in $366,000 of grants announced in January 2014. It says the trail links residents to the park and to other local trails and businesses.
OpenStreetMap maps Quarry Lake Trail as a bicycle route relation made of three asphalt cycleways about 10 feet wide, designated for bicycles and foot traffic and closed to motor vehicles. The record here measures about 1.3 miles (2.11 km), more than the half mile in the release; the sources read do not explain the difference. No manager page and no railroad history for the trail were found.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Mpls Flying Cloud Airport, 5.2 km from the trail's middle, 49 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 24 29 42 57 70 79 84 81 74 59 42 29 Low °F 8 12 24 37 49 59 64 62 53 40 27 14 Precipitation, in 0.7 0.6 1.5 2.7 3.9 4.7 4.3 4.7 3 2.3 1.4 0.9 - Wildlife refuges
Passes beside Minnesota Valley National Wildlife Refuge.
- Old maps
USGS topographic maps of the trail's middle go back to the 1896 Minneapolis sheet (1:62,500); the 1954 Eden Prairie sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Canterbury Trail within 0.2 mi · 5.5 mi, paved
- Minnesota Valley State Trail within 0.2 mi · 14.1 mi, paved
- Eagle Creek Trail 1.0 mi away · 12.6 mi, paved
- CH101 Trail 1.1 mi away · 2.9 mi, paved
- Scenic Heights to Tahpah Park Drainage Way Trail 2.1 mi away · 2.6 mi, paved
- Pioneer Trail 2.2 mi away · 6.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9860748, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Shakopee's New Quarry Lake Trail Opens To Public — Shakopee Mdewakanton Sioux Community · organization · checked Oct 17, 2026 Supports: half-mile length, Quarry Lake Park to Gateway Drive, ribbon cutting, November 7, 2014 release, $100,000, $366,000 grants
- Relation 9860748 (Quarry Lake Trail) — OpenStreetMap · web · checked Oct 17, 2026 Supports: bicycle route, asphalt cycleways, bicycle and foot designated, width, no motor vehicles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.