States › Massachusetts

Quinebaug Valley Rail Trail

Rail-trail in Massachusetts

Runs through Southbridge Town · Worcester County

Conditions now

Loading the weather near Southbridge Town…

Forecast by the National Weather Service for Southbridge Town · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.9 mi 3.1 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at River Street mile 0 directions to trailhead 1
  2. Parking at Hamilton Street mile 0.3 directions to trailhead 2
  3. Parking at Hamilton Street mile 0.3 directions to trailhead 3
  4. Parking at Larochelle Way mile 0.4 directions to trailhead 4
  5. Parking at Foster Street mile 0.5 directions to trailhead 5
  6. Parking at Central Street mile 0.5 directions to trailhead 6
  7. Parking at Foster Street mile 0.6 directions to trailhead 7
  8. Parking at Wardwell Court mile 0.6 directions to trailhead 8
  9. Parking at Crystal Street mile 0.8 directions to trailhead 9
Quinebaug Valley Rail Trail, Southbridge, 2025-11-09.jpg (opens in a new tab)
Quinebaug Valley Rail Trail, Southbridge, 2025-11-09.jpg · Photo: Peter Cooper Jr. · CC0 · Wikimedia Commons

About this trail

This record covers about 2.0 miles of the Quinebaug Valley Rail Trail through central Southbridge, Massachusetts, part of the route between Sturbridge and the Connecticut line that has its own page as the Titanic Rail Trail. Southbridge's section, about 5 miles, runs from the Westville Dam recreation area southeast to the Dudley line: some 21,000 feet on an abandoned rail line, where existing timber bridges remain, and 5,250 feet as a separated path along roads. It was built from September 2024 with $2.6 million from the federal Economic Development Administration, $500,000 from MassTrails and $1.5 million from MassDOT; a ribbon-cutting was held on November 7, 2025, with signage and a bridge over East Main Street still to come.

Sources checked Oct 13, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

46% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Southbridge 3 SW, 4.2 km from the trail's middle, 72 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F353645586877817972594939
Low °F171825354655605951393123
Precipitation, in43.54.64.43.74.44.34.44.254.15.1
Snow, in14.714.79.21.8000000.21.510.3
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1887 Brookfield sheet (1:62,500); the 1952 Southbridge sheet (1:24,000) shows the area at mid-century. Browse all 21 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

Southbridge, c. 1910–1915: Railroad station and train at the platform
Southbridge, c. 1910–1915: Railroad station and train at the platformPhoto: Unknown author · Public domain · Wikimedia Commons (opens in a new tab)

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. EDA award helps fund QVRT — Town of Southbridge (Civil Space) · web · checked Oct 13, 2026
    Supports: about 5 miles in Southbridge from the Westville Dam recreation area to the Dudley line, 21,000 feet on abandoned rail line and 5,250 feet on-road as a separated path, timber bridges remain, $2.6 million EDA, $500,000 MassTrails, $1.5 million MassDOT
  3. Quinebaug Valley Rail Trail Construction — Town of Southbridge (Civil Space) · web · checked Oct 13, 2026
    Supports: construction phase September 2024 to April 2026, signage and a bridge over East Main Street still to come
  4. QVRT Ribbon-Cutting — Town of Southbridge (Civil Space) · web · checked Oct 13, 2026
    Supports: ribbon-cutting on Friday, November 7, trail in final stages of construction

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.