Quonset Bike Path
Greenway in Rhode Island · OpenStreetMap relation
Runs through North Kingstown · Washington County
Conditions now
Loading the weather near Warwick…
Forecast by the National Weather Service for Warwick · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Newcomb Road mile 0.1 directions to trailhead 1
- Parking at Gate Road mile 0.2 directions to trailhead 2
- Parking at Iafrate Way mile 0.2 directions to trailhead 3
- Parking at Romano Vineyard Way mile 0.5 directions to trailhead 4
- Parking at Romano Vineyard Way mile 0.5 directions to trailhead 5
- Parking at Newcomb Road mile 0.5 directions to trailhead 6
- Parking at Newcomb Road mile 0.5 directions to trailhead 7
- Parking at Romano Vineyard Way mile 0.5 directions to trailhead 8
- Parking at Romano Vineyard Way mile 0.5 directions to trailhead 9
- Parking at Marine Road mile 2.4 directions to trailhead 10
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Quonset Bike Path, listed by the Rhode Island Department of Transportation as the Quonset/Davisville Bike Path, is a paved shared-use path of 3.7 miles in North Kingstown, Rhode Island. It was built by RIDOT and the Quonset Development Corporation (QDC) and opened to the public in July 2009; the first 2.5 miles cost the two agencies a combined $1.34 million. It is not a rail trail: its designer laid it out on a new 50-foot right-of-way along abandoned roadways and previously disturbed land.
The path is entirely off-road. From Post Road (U.S. Route 1), where it starts behind The Shops at Quonset Point, it follows the northern edge of the Quonset Business Park past undeveloped parcels of two former Navy bases, skirts a residential area and enters a wooded section. It then runs through the Calf Pasture Point nature area to Pettee Avenue in the Mount View neighborhood, ending at the Narragansett Street turnaround loop. Near the Mount View end is nearly a mile of undeveloped beach, and Calf Pasture Point has hiking trails. The Seabee Museum and Memorial Park, three public beaches in the business park, the North Kingstown Golf Course and ferry service to Martha's Vineyard are nearby.
The path is 12 feet wide with 2-foot grass shoulders, and its design includes 12 park benches and flower and tree plantings. Public parking lots are at Gateway Plaza and on Marine Road. QDC handles maintenance of the path itself, including trash and graffiti, and the North Kingstown Public Works Department handles issues beyond the path and in the Calf Pasture Point nature area.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
35% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Providence T F Green Airport, 11.5 km from the trail's middle, 5 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 38 40 48 59 69 78 84 82 75 64 53 43 Low °F 22 24 30 40 49 59 65 64 56 45 36 28 Precipitation, in 4 3.4 4.9 4.3 3.4 3.8 2.9 3.6 4.2 4.2 4.3 4.7 Snow, in 10.3 10.5 6.4 0.6 0 0 0 0 0 0.2 1 7.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1890 Narragansett Bay sheet (1:62,500); the 1957 Wickford sheet (1:24,000) shows the area at mid-century. Browse all 14 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
- Riders in November 2026 said the path can be loud from building work and industrial activity nearby, with the beachy stretch quieter, and that weekends were calmer, especially in the second section. r/RhodeIsland, Nov 2026
- Riders in November 2026 mentioned a memorial phone installation and a set-aside space for mourners on the path, and one said they had visited and rated it highly for grieving. r/RhodeIsland, Nov 2026
1 Reddit thread about this trail, Nov 2026
- Where can I go to grieve in nature, mostly in peace without trucks beeping, machinery noise, leaf blowers etc? r/RhodeIsland · Nov 2026 · 154 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Nearby trails
- Warwick Bicycle Path 3.7 mi away · 2.7 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 20419999, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Quonset/Davisville Bike Path — Rhode Island Department of Transportation · government source · checked Oct 13, 2026 Supports: name, 3.7 miles, built by RIDOT and QDC, opened July 2009, endpoints Post Road and Pettee Avenue, route along the business park, former Navy parcels and Calf Pasture Point, off-road, Narragansett Street turnaround, parking at Gateway Plaza and Marine Road, maintenance contacts, nearby attractions and beach
- QDC, DOT open bike path — Providence Business News (July 30, 2009) · web · checked Oct 13, 2026 Supports: 2.5-mile path opened July 2009, $1.34 million combined cost, northern perimeter of the business park from Post Road to Calf Pasture Point, 12 benches and plantings
- Quonset Shared-Use Path — Pare Corporation · web · checked Oct 13, 2026 Supports: 12-foot paved path with 2-foot grass shoulders, new 50-foot right-of-way along abandoned roadways and disturbed areas, completed July 2009
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.