Racine-Sturtevant Trail
Rail-trail in Wisconsin · OpenStreetMap relation
Runs through Village of Mount Pleasant and Racine · Racine County
Conditions now
Loading the weather near Racine…
Forecast by the National Weather Service for Racine · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at 21st Street mile 1.5 directions to trailhead 1
- Parking at Castle Court mile 1.6 directions to trailhead 2
- Parking at 21st Street mile 1.9 directions to trailhead 3
- Parking at 21st Street mile 2.2 directions to trailhead 4
- Parking at 21st Street mile 2.2 directions to trailhead 5
Plan your visit
- By trainAmtrak: Sturtevant, WI (SVT) 1.7 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Racine-Sturtevant Trail is an asphalt trail of about 3.5 miles in Racine County, Wisconsin, running from the west side of Racine to near the eastern edge of the Village of Sturtevant. TrailLink classes it as a rail-trail and says it occupies an abandoned rail corridor for most of its length, leaving the corridor only for a short diversion from South Green Bay Road to Loni Lane. It is part of Racine County's trail system and of the Route of the Badger, a Milwaukee-area trail network, and TrailLink describes it as the only off-road route heading west out of Racine.
The eastern end is on the North Shore Trail at West Boulevard, just north of 19th Street in Racine. From there the trail heads west through a mix of open space, industrial property and overhead power lines, crossing Lathrop Avenue, South Ohio Street, South Green Bay Road (State Highway 31), 21st Street and Oakes Road, to Willow Road in Mount Pleasant. At the western end it connects with the Pike River Pathway, which runs north and south along the Pike River, and with the Racine County Bike Trail into the center of Sturtevant, which begins half a mile up Willow Road.
There are no dedicated parking lots; the trail can be reached at its two ends and at the road crossings. Farther west, Racine County in October 2020 proposed $500,000 toward buying an 11-mile section of the Canadian Pacific Railway between Sturtevant, Mount Pleasant, Yorkville, Union Grove and Dover for the Route of the Badger, using $1 million already designated by the state's Knowles-Nelson Stewardship Program. The county said the corridor would nearly connect east and west across Racine County and give 56 miles of uninterrupted trail in the network.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
13% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Racine Batten Airport, 6.7 km from the trail's middle, 14 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 34 43 54 66 76 81 80 73 61 47 36 Low °F 16 18 28 37 46 57 63 63 55 43 32 22 Precipitation, in 1.2 1.1 2.1 3.7 3.5 4 2.9 3.4 3.2 2.9 2.2 1.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1892 Racine sheet (1:62,500); the 1958 Racine South sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Pike River Pathway within 0.2 mi · 6.7 mi, paved
- North Shore Trail within 0.2 mi · 8.0 mi, paved
- Root River Pathway 0.8 mi away · 2.8 mi, paved
- Racine MRK Trail 2.9 mi away · 4.7 mi, crushed stone
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 13753177, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Racine County Announces Rails-to-Trails Funding — Village of Union Grove · government source · checked Oct 15, 2026 Supports: October 13, 2020 proposal of $500,000; $1 million Knowles-Nelson Stewardship funds; 11-mile Canadian Pacific section between Sturtevant, Mount Pleasant, Yorkville, Union Grove and Dover; Route of the Badger; nearly connect east to west across Racine County; 56 miles of uninterrupted trail
- Racine-Sturtevant Trail — TrailLink · web · checked Oct 15, 2026 Supports: 3.5 miles; asphalt; rail-trail; abandoned rail corridor with diversion from S. Green Bay Road to Loni Lane; open space, industrial properties, power lines; only off-road route west from Racine; endpoints at North Shore Trail/West Blvd north of 19th St and Willow Rd in Mount Pleasant; road crossings; Pike River Pathway and Racine County Bike Trail connections; Route of the Badger; no dedicated parking
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.