Rails-to-Trails Greenway
Rail-trail in North Carolina
Runs through Jacksonville · Onslow County
Conditions now
Loading the weather near Jacksonville…
Forecast by the National Weather Service for Jacksonville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Holcomb Boulevard mile 0.1 directions to trailhead 1
- Parking at Bell Fork Road mile 3.8 directions to trailhead 2
- Parking at Elizabeth Street mile 5.4 directions to trailhead 3
- Parking at Marine Boulevard mile 5.9 directions to trailhead 4
- Parking at Marine Boulevard mile 6 directions to trailhead 5
- Parking at Johnson Boulevard mile 6.2 directions to trailhead 6
- Parking at Bordeaux Street mile 6.3 directions to trailhead 7
- Parking at Bordeaux Street mile 6.3 directions to trailhead 8
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Rails to Trails Greenway, also called the Jacksonville-Camp Lejeune Rail-to-Trails path, is a paved rail-trail in Jacksonville, Onslow County, North Carolina. It runs on abandoned rail beds from the Marine Corps base at Camp Lejeune, in the Midway Park area, about 5.2 miles northwest to Marine Boulevard (US 17) in Jacksonville. According to Onslow County Tourism, the plan is to make it part of a 172-mile network of pedestrian paths linking Jacksonville sights including Riverwalk Crossing Park and the Beirut Memorial.
This record maps about 6.5 miles. Its southeastern end is at Holcomb Boulevard near the base, and the route runs northwest past Bell Fork Road to Marine Boulevard, then west toward Johnson Boulevard and Bordeaux Street. Parking is available on Onslow Drive between Marine Boulevard and Eastwood Drive, and off Bell Fork Road near its intersection with the US 17 Bypass.
In July 2023 crews began extending the greenway from its end to Court Street, narrowing the road to make room for a 10-foot asphalt trail for biking and walking that would replace the sidewalk on that section of Court Street; the traffic signal at New Bridge Street and Railroad Street was to be removed, and the work was expected to take three to four months.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
37% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
New River Mcaf, 5.2 km from the trail's middle, 3 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 59 66 74 80 86 89 88 83 75 66 59 Low °F 35 38 43 52 60 68 72 71 66 55 44 38 Precipitation, in 4 3.5 3.8 3.4 4.2 5.2 6.2 7.5 7.5 4.1 3.5 3.7 Snow, in 0.4 0.2 0 0 0 0 0 0 0 0 0 0 - Old maps
USGS topographic maps of the trail's middle go back to the 1948 New River sheet (1:62,500); the 1952 Jacksonville South sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Biking Trails of Onslow — Only In Onslow (Onslow County Tourism) · web · checked Oct 16, 2026 Supports: names Rails to Trails Greenway and Jacksonville-Camp LeJeune Rail-to-Trails, abandoned rail beds from Camp Lejeune (Midway Park area) 5.2 miles northwest to Marine Boulevard, planned 172-mile network linking Riverwalk Crossing Park and the Beirut Memorial, parking on Onslow Drive and off Bell Fork Road
- Rails to Trails Greenway extension project kicks off in Jacksonville — WCTI12 (July 13, 2023) · web · checked Oct 16, 2026 Supports: extension from the greenway's end to Court Street, road narrowing, 10-foot asphalt trail replacing the Court Street sidewalk, removal of the New Bridge Street and Railroad Street signal, three to four months
- OpenStreetMap ways for the Rails-to-Trails Greenway · web · checked Oct 16, 2026 Supports: mapped extent from Holcomb Boulevard past Bell Fork Road and Marine Boulevard to Johnson Boulevard and Bordeaux Street, paved surface, about 6.5 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.