States › Wisconsin

Rat River Recreation Trail

Greenway in Wisconsin · OpenStreetMap relation

Runs through Blackwell and Wabeno · Forest County

Conditions now

Loading the weather near Laona…

Forecast by the National Weather Service for Laona · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
6.7 mi 10.8 km1
On former railbed
2.7 mi 40%
Surface
Gravel1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Rat River Recreation Trail drawn on the 1946 USGS topographic map of Laona, Wisconsin
Then: the 1946 USGS Laona sheet (1:48,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Rat River Recreational Trail is a non-motorized trail on the Lakewood-Laona Ranger District of the Chequamegon-Nicolet National Forest in Forest County, Wisconsin. The Town of Blackwell and local residents sought it as a route for biking, hiking and cross-country skiing between the Nicolet State Trail, which is open to snowmobiles and ATVs, and Bear Lake Campground, so that non-motorized users would not have to travel on roads open to traffic. District Ranger Jeff Seefeldt signed the decision approving the project on February 17, 2012, and the Forest Service lists it as completed.

The trail follows the Rat River on an abandoned railroad grade, which the Forest Service acquired in 1947, and on forest roads. As planned it runs about 6.8 miles, roughly 6.1 of them on the grade. The west segment, about 2.74 miles, starts where the grade meets the Nicolet State Trail along Blackwell Junction Road. The route then uses town roads in Blackwell, Grant Lane and Flanner Lane, and County Highway H, before an east segment of about 4.02 miles follows Forest Road 3220 and connecting forest roads to Bear Lake Road.

The project called for clearing about 1.8 miles of overgrown grade, pulling up protruding railroad ties, improving drainage and laying gravel for a uniform tread, along with gates, signs, parking areas, and picnic tables and benches at scenic spots by the river. It also proposed closing three forest roads on the route to highway vehicles. Before the project, the grade's only improvement was a bridge over the Rat River. About 2.5 miles of the corridor is also part of the snowmobile trail system.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

68% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Laona 6 SW, 12.7 km from the trail's middle, 75 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F202436496370737164523725
Low °F4616284150555446352311
Precipitation, in1.31.21.93.13.84.743.23.83.32.11.7
Snow, in16.412.613.79.50.800002.39.315.5
Old maps

USGS topographic maps of the trail's middle go back to the 1939 Laona sheet (1:48,000); the 1946 Laona sheet (1:48,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 15828565, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Rat River Recreational Trail — Chequamegon-Nicolet National Forest, USDA Forest Service · government source · checked Oct 15, 2026
    Supports: new trail on an abandoned railroad grade and roads following the Rat River; Lakewood-Laona Ranger District; Forest County; decision signed 02/17/2012; status completed
  3. Rat River Recreational Trail Project Environmental Assessment — USDA Forest Service (archived by the Federal Depository Library Program) · government source · checked Oct 15, 2026
    Supports: Town of Blackwell request; non-motorized link from Nicolet State Trail (open to snowmobiles and ATVs) to Bear Lake Campground; biking, hiking, cross-country skiing; grade acquired 1947; 6.1 miles on grade, 0.7 on roads; west segment 2.74 miles from the NST along Blackwell Junction Road; Grant Lane, County Highway H, Flanner Lane; east segment 4.02 miles via FR 3220 to Bear Lake Road; 6.76-mile total; proposed clearing of 1.8 miles, tie removal, drainage, gravel tread, gates, signs, tables, benches, parking; closing FR 3075A, 3220 and 3770B to highway vehicles; bridge over the Rat River; 2.5 miles of snowmobile trail
  4. Rat River Recreational Trail Project decision letter, February 17, 2012 — Lakewood-Laona Ranger District, USDA Forest Service (archived) · government source · checked Oct 15, 2026
    Supports: Decision Notice/FONSI signed by District Ranger Jeff Seefeldt, February 17, 2012

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.