Redbud Trail
Rail-trail in Kansas · OpenStreetMap relation
Runs through Wichita and Andover · Sedgwick and Butler counties
Conditions now
Loading the weather near Wichita…
Forecast by the National Weather Service for Wichita · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at North Roosevelt Avenue mile 1.8 directions to trailhead 1
- Parking at East 13th Street North mile 1.8 directions to trailhead 2
- Parking at Vesta Drive mile 1.9 directions to trailhead 3
- Parking at East 17th Street North mile 2.6 directions to trailhead 4
- Parking at North Oliver Street mile 2.7 directions to trailhead 5
- Parking at North Rock Road mile 4.5 directions to trailhead 6
- Parking at North Webb Road mile 5.7 directions to trailhead 7
- Parking at Summerfield Street mile 6.9 directions to trailhead 8
- Parking at Summerfield Street mile 6.9 directions to trailhead 9
- Parking at Lafayette Street mile 10.7 directions to trailhead 10
- Parking at Lafayette Street mile 10.7 directions to trailhead 11
- Parking at Patrica Lane mile 11.2 directions to trailhead 12
- Parking at Patrica Lane mile 11.3 directions to trailhead 13
About this trail
The Redbud Trail is a rail-trail in the Wichita area of Kansas, built on the former Burlington Northern Santa Fe Railroad easement. It crosses Sedgwick County through Wichita and continues east through Andover in Butler County toward Augusta. OpenStreetMap maps the route at about 16 miles, running to near Augusta. The Andover Augusta Railtrail Initiative (AARTI), an all-volunteer nonprofit formed about nine years before 2025 to turn the corridor into a trail between the two cities, worked with the City of Andover on the Andover section.
In Wichita, a 2015 press report counted 11 miles of corridor on the Sedgwick County side, of which 3 miles were then paved concrete. It passes city parks, employment areas and the Wichita State University campus, and meets the McAdams trail that links to the K-96 bike path. Decorative steel arches called pause points mark places along the route, including 13th and Roosevelt, 17th and Oliver, and 9th and Hillside. The Andover section is a 6-mile conversion from 159th Street East at the Butler County line to Santa Fe Lake Road, with 2.09 miles of concrete and 4 miles of packed limestone, according to AARTI.
A bridge over Highway 54 east of Andover was completed in autumn 2025, with a ribbon cutting set for November 7. A second bridge, over the Whitewater River just west of Augusta, is hoped for in 2027. AARTI is raising money to build the remaining 4 miles to Augusta, so the trail is not yet continuous to that city.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 100% of this route as a trail on former railroad right-of-way.
- Shade
8% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: March to April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Wichita Jabara Airport, 4.9 km from the trail's middle, 25 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 43 48 59 68 77 86 92 90 82 70 57 45 Low °F 23 26 35 45 55 65 69 68 59 47 35 26 Precipitation, in 0.6 1.1 2.1 3 5.2 4.8 3.6 3.8 3.1 2.8 1.3 1.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1889 Wichita sheet (1:125,000); the 1956 Andover sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
What riders say on Reddit
1 Reddit thread about this trail, Dec 2025
- Redbud Trail question r/wichita · Dec 2025 · 6 comments
What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationAARTI - Andover Augusta Railtrail Initiative (Redbud Rail Trail)
- RedditSearch Reddit: r/kansas
Nearby trails
- Wichita Bike Path within 0.2 mi · 19.0 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9725095, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Home - AARTI - Redbud Rail Trail · organization · checked Oct 18, 2026 Supports: Andover section length, endpoints and surfaces; planned 4-mile extension to Augusta; volunteer organization
- 4ward - AARTI - Redbud Rail Trail · organization · checked Oct 18, 2026 Supports: fundraising campaign to complete the trail to Augusta
- Redbud Bike Trail Bringing Art and History to Community - The Community Voice · press · checked Oct 18, 2026 Supports: Wichita corridor, 11 miles on the Sedgwick County side, 3 paved miles in 2015, parks, WSU, McAdams trail and K-96 link, pause points
- Redbud Trail bridge over Highway 54 open - The Active Age · web · checked Oct 18, 2026 Supports: former BNSF easement, AARTI formed nine years earlier, Highway 54 bridge, Whitewater River bridge timing, trail operating inside Wichita, Andover and Augusta
- Redbud Trail - IC in the ICT · web · checked Oct 18, 2026 Supports: locations of the three pause points
- OpenStreetMap · web · checked Oct 18, 2026 Supports: mapped length of about 16 miles and eastern extent
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.