States › Indiana

Rhea Park Trail

Greenway in Indiana

Runs through Terre Haute · Vigo County

Conditions now

Loading the weather near Terre Haute…

Forecast by the National Weather Service for Terre Haute · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.2 mi 3.6 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 1.1 directions to trailhead 1
Rhea Park Trail drawn on the 1958 USGS topographic map of Terre Haute, Indiana
Then: the 1958 USGS Terre Haute sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

Rhea Park Trail is the name OpenStreetMap gives to a paved loop around Rea Park, the city golf course on the south side of Terre Haute, Indiana; the park's own name is spelled Rea. The loop is the Terre Haute portion of the Riley Spur Trail, also called the Riley Trail, a Vigo County project planned to run seven miles and connect places in and around Terre Haute.

Construction of the Terre Haute portion began in March 2026 on the north side of Thompson Ditch and moved clockwise along Royse Drive, 7th Street and Davis Drive, creating a loop around Rea Park, with a portion north of Davis Drive to connect to a larger trail expansion. The path is mainly 10 feet wide and asphalt, with shared-roadway sections on Royse Drive between 8th and 11th streets and at the park's tennis court parking lot and access road off Davis Drive. OpenStreetMap maps the loop as about 2.2 miles of asphalt path.

Vigo County opened the first phase of the Riley Spur Trail, 1.61 miles from Louisville Road to Lama Road, in August 2024, paid for with $652,247 of the county's American Rescue Plan Act funds. Phase two is funded by an Indiana Department of Natural Resources Next Level Trails grant; county commissioner Mike Morris described its route as running from Seventh and Margaret down to Canal Road and Springhill junction, linking up behind the Idle Creek Golf Course.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

17% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Terre Haute Hulman Regional Airport, 8.7 km from the trail's middle, 26 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F374253657583868579675341
Low °F212433435362656254433426
Precipitation, in2.622.94.74.74.64.332.93.432.5
On the National Register
  • Rea Park, Terre Haute · historic district, listed 2017
Old maps

USGS topographic maps of the trail's middle go back to the 1941 Terre Haute sheet (1:24,000); the 1958 Terre Haute sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Construction on Riley Trail begins — Tribune-Star (March 27, 2026) · web · checked Oct 15, 2026
    Supports: construction start, Thompson Ditch, route along Royse Drive, 7th Street and Davis Drive forming a loop around Rea Park, extension north of Davis Drive, 10-foot asphalt, shared-roadway sections
  3. Progress being made on renovations at Rea Park — MyWabashValley.com (February 2025) · web · checked Oct 15, 2026
    Supports: Rea Park golf course, Riley Spur Trail path around Rea Park
  4. First phase of Riley Spur Trail completed — MyWabashValley.com (August 2024) · web · checked Oct 15, 2026
    Supports: first phase 1.61 miles Louisville Road to Lama Road, ARPA funding, Next Level Trails grant for phase two, seven-mile total, commissioner's description of the phase-two route
  5. Rhea Park Trail — OpenStreetMap · web · checked Oct 15, 2026
    Supports: trail name, asphalt surface, mapped loop

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.