States › Ohio

Richard L. Frederick Memorial Bikeway

Greenway in Ohio

Runs through Bellbrook · Greene County

Conditions now

Loading the weather near Bellbrook…

Forecast by the National Weather Service for Bellbrook · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.5 mi 2.4 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East Walnut Street mile 0 directions to trailhead 1
  2. Parking at Upper Bellbrook Road mile 0.8 directions to trailhead 2
  3. Parking at Upper Bellbrook Road mile 0.8 directions to trailhead 3
  4. Parking at Upper Bellbrook Road mile 0.9 directions to trailhead 4
  5. Parking at Upper Bellbrook Road mile 0.9 directions to trailhead 5
  6. Parking at Upper Bellbrook Road mile 1 directions to trailhead 6
  7. Parking at Upper Bellbrook Road mile 1.1 directions to trailhead 7
  8. Parking at Upper Bellbrook Road mile 1.3 directions to trailhead 8
Bellbrook, along the trail (opens in a new tab)
Bellbrook, along the trail · Photo: Nyttend · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Richard Frederick Bikeway is a path in Bellbrook, Ohio, in the Miami Valley. Slides from the Miami Valley Regional Planning Commission on Bellbrook's Safe Routes to School work refer to it as an existing bikeway, with a 10-foot multi-use path funded in 2012 that begins at its terminus on the east side of Upper Bellbrook Road. OpenStreetMap shows a paved line of about 1.5 miles, with a trailhead on East Walnut Street. The pages read give no length, history or rules for the bikeway.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and September to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Dayton Wright Bros Airport, 14.7 km from the trail's middle, 10 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F394353657583868579675443
Low °F222533435362656356453527
Precipitation, in2.92.33.54.44.24.93.62.8333.13.2
Old maps

USGS topographic maps of the trail's middle go back to the 1913 Waynesville sheet (1:62,500); the 1955 Bellbrook sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Safe Routes to School in Bellbrook - Miami Valley Regional Planning Commission (slides) · organization · checked Oct 18, 2026
    Supports: bikeway name, terminus on Upper Bellbrook Road, 2012 10-foot path
  3. OpenStreetMap ways for this trail · web · checked Oct 18, 2026
    Supports: record length, paved surface, East Walnut Street trailhead

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.