States › Wisconsin

River Bend Trail

Rail-trail in Wisconsin · OpenStreetMap relation

Runs through Merrill · Lincoln County

Conditions now

Loading the weather near Merrill…

Forecast by the National Weather Service for Merrill · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The trail can be accessed from the main trailhead located at the end of South Park Street, from the east at the corners of Cooper and Logan Sts., from Polk Street behind Weinbrenners and from the west by the bridge on West Main St. near Cottage St.

Length
2.6 mi 4.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at River Street mile 0.8 directions to trailhead 1
  2. Parking at River Street mile 0.8 directions to trailhead 2
  3. Parking at East 1st Street mile 0.9 directions to trailhead 3
  4. Parking at East 1st Street mile 0.9 directions to trailhead 4
  5. Parking at East Main Street mile 0.9 directions to trailhead 5
  6. Parking at River Street mile 0.9 directions to trailhead 6
  7. Parking at East Main Street mile 1 directions to trailhead 7
  8. Parking at East 1st Street mile 1 directions to trailhead 8
  9. Parking at East 1st Street mile 1 directions to trailhead 9
  10. Parking at South Scott Street mile 1 directions to trailhead 10
  11. Parking at South Scott Street mile 1 directions to trailhead 11
  12. Parking at East 1st Street mile 1 directions to trailhead 12
Merrill Wisconsin City Hall Historic (opens in a new tab)
Merrill Wisconsin City Hall Historic · Photo: Royalbroil · CC BY-SA 3.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The River Bend Trail is a paved trail along the north bank of the Wisconsin River in Merrill, Lincoln County, Wisconsin, curving from Council Grounds State Park east toward the Pine Ridge business area. It was developed by volunteers of the River District Development Foundation, and the Friends of the River Bend Trail raises donations for it. A 2013 report from the National Park Service's Rivers, Trails, and Conservation Assistance Program described how civic leaders, seeing the river alongside abandoned railroad tracks, proposed a 2.5-mile riverfront trail linking parks on the city's western edge to downtown; program staff led the foundation through public design workshops and a concept plan. The foundation bought 1.25 miles of disused Canadian National Railway line, and parts of the route sit on the old railbed.

The main trailhead, with parking, is at the end of South Park Street in downtown Merrill beside the Agra Pavilion, a rehabilitated warehouse. From there the trail runs east to Cooper Street and west to State Highway 64 (Main Street). In June 2021 a newly paved section on a former railroad bed, lined with old stone walls, extended the trail to Council Grounds State Park. WXPR reported that the extension brought the trail to 5.5 miles, reaching State Highway 64 at Pine Ridge Avenue, though fencing still had to be installed before that section officially opened.

Landmarks include the former railroad bridge at the confluence of the Prairie and Wisconsin rivers, a concrete marker showing the water level of the 1912 flood, and the Gene Weith Memorial Fishing Pier, an accessible pier built with donations. Interpretive panels describe the sites, and motorized vehicles are not allowed. The foundation's long-term goal is a trail connection from Merrill to Wausau and eventually Tomahawk.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Merrill, 2.5 km from the trail's middle, 0 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F222739536776807870554027
Low °F3517304353575546342311
Precipitation, in1.21.11.82.93.74.63.843.93.22.11.5
Snow, in12.411.67.25.50.100000.9511.6
Old maps

USGS topographic maps of the trail's middle go back to the 1899 Wausau sheet (1:125,000); the 1951 Merrill sheet (1:48,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 11566122, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Rivers, Trails, and Conservation Assistance Program, Midwest Region: Projects and Partners 2013 - National Park Service · government source · checked Oct 15, 2026
    Supports: abandoned railroad tracks along the river, proposed 2.5-mile riverfront trail linking western parks to downtown, RTCA-led workshops and River Bend Concept Plan Report for the River District Development Foundation
  3. River Bend Trail Extends to Council Grounds State Park | WXPR (June 21, 2021) · organization · checked Oct 15, 2026
    Supports: 2021 paved extension to Council Grounds State Park on a former railroad bed with stone walls, 5.5-mile total to Hwy 64 and Pine Ridge Avenue, fencing pending, Friends of the River Bend Trail fundraising, Gene Weith Memorial Fishing Pier built with donations, River District Development Foundation, Merrill-Wausau-Tomahawk goal
  4. River Bend Trail | Travel Wisconsin · web · checked Oct 15, 2026
    Supports: trailhead at 400 S. Park Street, Merrill; no motorized vehicles
  5. River Bend Trail (WI) | Wisconsin Trails | TrailLink · web · checked Oct 15, 2026
    Supports: north bank of the Wisconsin River from Council Grounds State Park to the Pine Ridge area, purchase of 1.25 miles of Canadian National line by foundation volunteers, partly on railbed, asphalt, South Park Street trailhead and parking at the Agra Pavilion, endpoints Cooper Street and SR 64/Main Street, landmarks (railroad bridge at the Prairie confluence, 1912 flood marker, Agra Pavilion), interpretive panels

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.