River's Edge Trail
Rail-trail in Iowa · OpenStreetMap relation
Runs through Steamboat Rock, Eldora and Marshalltown · Hardin and Marshall counties
Conditions now
Loading the weather near Eldora…
Forecast by the National Weather Service for Eldora · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at County Road S56 mile 0 directions to trailhead 1
- Parking at Edgington Avenue mile 7.7 directions to trailhead 2
- Parking at Edgington Avenue mile 7.8 directions to trailhead 3
- Parking at Edgington Avenue mile 7.8 directions to trailhead 4
- Parking at Washington Street directions to trailhead 5
(opens in a new tab) About this trail
The River's Edge Trail, in full the Iowa River's Edge Trail (IRET), is a partly built 34-mile trail through Hardin and Marshall counties, Iowa, planned from Steamboat Rock through Eldora, Gifford, Union, Liscomb and Albion to Marshalltown along a former railroad line. It is led by two volunteer committees, the Hardin County Trails Committee and TRAILS, Inc. of Marshall County, with grant-writing help from the Iowa Natural Heritage Foundation; the City of Marshalltown has been a partner since the project was first proposed in 2011.
In 2013 the Iowa River Railroad made known that it wanted to close its line through Hardin County, remove the rails and divest the rail bed from Steamboat Rock to possibly as far south as Marshalltown. Supporters meeting in Eldora that year, helped by Iowa Natural Heritage Foundation staff, began seeking grants to buy the corridor for a trail.
Two pieces are paved, and this record maps them: a 4.8-mile section between Steamboat Rock and Eldora, and a stretch in Marshalltown from the 200 block of East Madison Street to Radio Tower Road and Summit Street west of the city, where the trail connects with the Linn Creek Recreational Trail. The trail is paved with concrete wide enough for emergency vehicles. An April 2024 Iowa TAP grant of $2 million covers paving from Eldora to Gifford and rebuilding the South Fork bridge, and in November 2024 the project received $745,000 from the Iowa DOT's State Recreational Trails Program. Bridge replacement began in Marshall County in December 2025, including a steel bridge from Marshalltown's Timber Creek Park installed near Radio Tower Road, with more bridges toward Albion to follow. In March 2026 Hardin County had funding to repair or replace all bridges to Union and to pave the trail to that town.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 64% of this route as an out-of-service rail line, naming the line Marshalltown and Masoncy-Mtown.
Former Iowa River Railroad / Chicago & North Western line, built 1868–1884, abandoned 1976–2012 in sections. From Iowa DOT Rail Line Abandoned (CC BY 4.0).
- Shade
12% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: July to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Eldora, 1.4 km from the trail's middle, 24 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 26 31 44 59 70 80 84 82 76 62 45 32 Low °F 8 13 24 35 48 59 62 59 50 38 26 15 Precipitation, in 1.1 1.2 2.1 4 5.2 5.9 4.1 4.5 3.6 2.8 1.9 1.6 Snow, in 8.1 8.8 4 1.4 0.4 0 0 0 0 0.3 1.8 8.4 - On the National Register
- Eldora Downtown Historic District, Eldora · historic district, listed 2009 · nomination file for Eldora Downtown Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1954 Waterloo sheet (1:250,000); the 1955 Waterloo sheet (1:250,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/Iowa
Nearby trails
- Pine Lake Recreation Trail within 0.2 mi · 2.4 mi, paved
- Linn Creek Recreational Trail 0.2 mi away · 18.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 19482370, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Official trail website · Official site · checked Oct 31, 2026
- Progress 2026: Brick by brick, Iowa River's Edge Trail work underway — Times-Republican (March 2026) · press · checked Oct 15, 2026 Supports: 34-mile Iowa River's Edge Trail, Hardin and Marshall counties, Steamboat Rock to Marshalltown; towns on the route; idea started 2011; Marshalltown a partner since 2011; INHF grant-writing help to the two volunteer committees; Hardin County Trails Committee; TRAILS, Inc.; concrete paving wide enough for emergency vehicles; Marshalltown paving from the 200 block of East Madison Street to Radio Tower Road and Summit Street; bridge over a creek near Radio Tower Road; bridge work toward Albion; Hardin County funding for bridges and paving to Union; $2 million grant for Eldora to Gifford
- Bridge work underway on Iowa River's Edge Trail in Marshall County — Times-Republican (January 2026) · press · checked Oct 15, 2026 Supports: former railroad line; 4.8-mile paved section between Steamboat Rock and Eldora; $745,000 State Recreational Trails Program award in November 2024; Bridge No. 2 work begun in December near Radio Tower Road and Summit Street with a steel bridge from Timber Creek Park; April 2024 Iowa TAP grant for Eldora to Gifford paving and South Fork bridge; connection with the Linn Creek Recreational Trail
- Rail bed eyed for big trail segment — BikeIowa (2013) · web · checked Oct 15, 2026 Supports: Iowa River Railroad's plan to close the line, remove the steel and divest the rail bed from Steamboat Rock to possibly Marshalltown; Eldora meeting with Iowa Natural Heritage Foundation staff preparing grant applications
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.