Riverton Rail Trail
Trolley trail in Maine
Runs through Portland · Cumberland County
Conditions now
Loading the weather near Portland…
Forecast by the National Weather Service for Portland · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Riverton Rail Trail is a stone-dust path through the Riverton neighborhood of Portland, Maine, maintained by Portland Trails. Portland Trails lists it at 1.8 miles; this record maps about 1 mile. The trail runs through woods beside an active railroad, and freight trains pass a few times each day. It serves as a flat off-road shortcut between Riverton and Morrills Corner.
From the Goodridge Road trailhead the trail is about 8 feet wide and flat, and most of it can be used with wheeled mobility aids and strollers. Where it turns away from the tracks toward Milliken Street it narrows, with several steep hills and short boardwalks. Along the way it crosses Dole Brook, a small stream that flows to the Presumpscot River. Crossing the railroad tracks is unsafe and illegal.
In 2025 Portland Trails upgraded the trail to an Improved Access Trail. Cycling is among its listed activities, and dogs must be on a leash or under voice control. Street parking is available at Wall Street, 9th Street, Luke Street, Harris Avenue, Newton Street and Milliken Street, and METRO bus routes 2, 9A and 9B serve the area. The trail has benches.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
75% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Portland International Jetport, 5.7 km from the trail's middle, 14 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 35 42 54 64 74 80 79 71 60 48 38 Low °F 16 17 26 35 46 55 61 60 52 41 32 22 Precipitation, in 3.5 3.5 4.1 4.4 3.7 4.2 3.4 3.6 3.8 5.2 4.2 4.5 Snow, in 18.6 16.6 13.6 2.8 0 0 0 0 0 0.2 2.3 14.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Portland sheet (1:62,500); the 1956 Portland West sheet (1:24,000) shows the area at mid-century. Browse all 16 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationPortland Trails — Riverton Rail Trail
Nearby trails
- Back Cove Trail 1.6 mi away · 3.8 mi, paved
- Eastern Prom Multi-Use Trail 2.5 mi away · 1.8 mi, paved
- Greenbelt Walkway 4.1 mi away · 4.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Riverton Rail Trail — Portland Trails · organization · checked Oct 13, 2026 Supports: 1.8 miles, stone dust, maintained by Portland Trails, woods beside train tracks with freight trains a few times a day, 2025 Improved Access upgrade, steep hills toward Milliken Dr., cycling activity, dog rule, parking streets, METRO routes 2, 9A and 9B, benches
- Riverton Rail — Tails of the Trails (Portland Press Herald / MaineToday Media) · press · checked Oct 13, 2026 Supports: crosses Dole Brook, which flows to the Presumpscot River
- Riverton Rail Trail — Maine Trail Finder · web · checked Oct 13, 2026 Supports: Goodridge Road trailhead, about 8 feet wide and flat, accessible for wheeled mobility aids, narrower with boardwalks toward Milliken Street, shortcut between Riverton and Morrills Corner, crossing the tracks unsafe and illegal
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.