States › North Carolina

Rocky Mount Greenway

Greenway in North Carolina

Runs through Rocky Mount · Nash and Edgecombe counties

Conditions now

Loading the weather near Rocky Mount…

Forecast by the National Weather Service for Rocky Mount · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
3.7 mi 6.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Falls Road mile 1.2 · restrooms directions to trailhead 1
  2. Parking at Battlepark Lane mile 1.5 directions to trailhead 2
  3. Parking at Battlepark Lane mile 1.9 directions to trailhead 3
  4. Parking at Morgan Street mile 2.1 directions to trailhead 4
  5. Parking at Spruce Street mile 2.5 directions to trailhead 5
  6. Parking at Pennsylvania Avenue mile 2.8 directions to trailhead 6

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Rocky Mount Mills, beside the trail (opens in a new tab)
Rocky Mount Mills, beside the trail · Photo: Melissa Platero · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Rocky Mount Greenway, also called the Tar River Trail, is a paved greenway along the Tar River in Rocky Mount, North Carolina. MTB Project lists City of Rocky Mount Parks and Recreation as its manager. Wikipedia describes the Tar River Trail as a 7-mile greenway running east to west along the river and linking several parks, city landmarks and the city's sports complex, among them City Lake Park, built in 1937 by the Works Progress Administration, and the 57-acre Battle Park at the falls of the Tar River. The trail includes a 220-foot clear-span wooden bridge, believed to be the longest such wooden bridge in the United States.

Our map record covers about 3.75 miles of the greenway in OpenStreetMap, from Sunset Park on Sunset Avenue east along the river past Battle Park and Falls Road to Martin Luther King Jr. Park in the Hillsdale area. Mapped parking is at Falls Road, where there are restrooms, and along Battlepark Lane, Morgan Street, Spruce Street and Pennsylvania Avenue. In Battle Park the greenway passes a set of natural-surface mountain bike loops.

OpenStreetMap maps the whole route as paved, with several short bridges. MTB Project records 3.1 miles of paved path with an average grade of 1 percent and a maximum of 4 percent, starting across from Sunset Park and crossing the Tar River.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

42% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: March to May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Rocky Mt 8 ESE, 12.5 km from the trail's middle, 12 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F505461717885888581726555
Low °F313238475765696762503934
Precipitation, in3.233.93.53.64.85.15.36.23.53.23.2
Snow, in1.90.30.2000000000.4
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1902 Rocky Mount sheet (1:62,500); the 1954 Rocky Mount sheet (1:250,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Rocky Mount, North Carolina — Wikipedia · organization · checked Oct 16, 2026
    Supports: Tar River Trail is a 7-mile greenway along the river linking parks, landmarks and the sports complex; City Lake Park built 1937 by the WPA; 57-acre Battle Park at the falls; 220-foot clear-span wooden bridge
  3. Tar River Trail (Rocky Mount Greenway) — MTB Project · web · checked Oct 16, 2026
    Supports: alternate name, City of Rocky Mount Parks and Recreation as land manager, paved, 3.1 miles, average grade 1 percent and maximum 4 percent, start across from Sunset Park, river crossing
  4. Rocky Mount Greenway — OpenStreetMap way 827045527 (one of the record's ways) · web · checked Oct 16, 2026
    Supports: mapped length about 3.75 miles, route from Sunset Park past Battle Park and Falls Road to Martin Luther King Jr. Park, paved surface, short bridges, parking locations and Falls Road restrooms, Battle Park mountain bike loops nearby

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.