Route 104 Trail
Greenway in New York
Runs through Town of Webster · Monroe County
Conditions now
Loading the weather near Irondequoit…
Forecast by the National Weather Service for Irondequoit · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Route 104 Trail is a paved path in New York mapped in OpenStreetMap as four pieces of asphalt cycleway designated for bicycles and pedestrians, about 1.3 miles in this record. The name follows NY Route 104.
A separate planning effort used the same corridor name. The Genesee Transportation Council's Route 104 Corridor Trail feasibility study, discussed by its Planning Committee on October 13, 2011, examined a 17.4-mile multi-use trail from Webster to Sodus, with one route parallel to the highway and one along the railroad. Rochester Gas and Electric owns the rail right-of-way in Monroe County, and the abandoned section west of the Xerox campus was slated to pass to the Town and Village of Webster. The sources do not say whether the mapped path is part of that proposal.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
28% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Rochester Gtr International Airport, 17.7 km from the trail's middle, 41 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 33 35 44 57 69 78 82 80 74 61 49 38 Low °F 19 20 27 37 48 57 62 61 54 43 34 25 Precipitation, in 2.5 2.1 2.5 3 2.9 3.4 3.6 3.3 3.2 3.2 2.8 2.7 Snow, in 27.4 23.1 17.9 3 0.1 0 0 0 0 0.1 8.1 22.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1895 Rochester sheet (1:62,500); the 1952 Rochester East sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Hojack Trail 1.4 mi away · 4.9 mi, crushed stone
- Irondequoit Lakeside Trail 1.7 mi away · 4.7 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Route 104 Corridor Trail (Webster to Sodus) Feasibility Study — Genesee Transportation Council · organization · checked Oct 18, 2026 Supports: 17.4-mile Webster to Sodus proposal, two alternatives, RG&E ownership, Xerox campus section, October 13, 2011 committee meeting
- Route 104 Trail — OpenStreetMap way 354646279 · web · checked Oct 18, 2026 Supports: name Route 104 Trail, asphalt cycleway, bicycle and foot designated (three further ways carry the same tags)
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.