States › Illinois

Route 66 Trail

Rail-trail in Illinois · OpenStreetMap relation

Runs through Chenoa, Lexington, Towanda, Normal and Bloomington · McLean County

Conditions now

Loading the weather near Towanda…

Forecast by the National Weather Service for Towanda · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
20.4 mi 32.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at East 3000 North Road mile 1.1 directions to trailhead 1
  2. Parking at Original Route 66 Roadbed mile 13 directions to trailhead 2
  3. Parking mile 16.3 directions to trailhead 3
  4. Parking mile 16.3 directions to trailhead 4
  5. Parking at Oglethorpe Avenue mile 20.8 directions to trailhead 5
  6. Parking at Pine Street mile 21 · water directions to trailhead 6
  7. Government Center Lot mile 24.7 directions to Government Center Lot
  8. Parking at East Grove Street mile 24.7 directions to trailhead 8
  9. Parking at East Washington Street mile 24.7 directions to trailhead 9
  10. Parking at East Washington Street mile 24.7 directions to trailhead 10
  11. Parking at South East Street mile 24.7 directions to trailhead 11
  12. Parking at North Main Street mile 24.8 directions to trailhead 12
  13. Parking at North Main Street mile 24.8 directions to trailhead 13
  14. Parking at South Center Street mile 24.8 directions to trailhead 14
  15. Parking at North Madison Street mile 24.9 directions to trailhead 15
  16. Parking at North Roosevelt Avenue mile 24.9 directions to trailhead 16
  17. Parking at South Center Street mile 24.9 directions to trailhead 17
  18. Parking at South Roosevelt Avenue mile 24.9 directions to trailhead 18
  19. Parking at Access Way mile 28.6 directions to trailhead 19
  20. Parking mile 32.7 · restrooms directions to trailhead 20
  21. Parking mile 36 directions to trailhead 21

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).

Route 66 Trail (opens in a new tab)
Photo: voschix · CC BY-SA 4.0 · Mapillary

About this trail

McLean County's Historic Route 66 Trail is a bicycle and pedestrian route in central Illinois that follows the corridor of old U.S. Highway 66 across McLean County, from the village of McLean in the south through Funks Grove, Shirley, Bloomington, Normal, Towanda and Lexington to Chenoa in the north. McLean County names the cities of Bloomington, Lexington and Chenoa, the Town of Normal and the Village of Towanda as partners, and designates the route a section of the larger Constitution Trail. The route combines stretches of the old highway set aside for non-motorized use, more bicycle-friendly local roads and off-road trail.

The county lists the route in segments: McLean to Funks Grove (4.8 miles), Funks Grove to Shirley in two phases (3.1 miles), Shirley to Bloomington (4.4 miles), Bloomington to Normal (7.8 miles), Normal to Towanda (4.2 miles), Towanda to Lexington in two phases (6 miles), through Lexington (2.3 miles), Lexington to Chenoa (5.8 miles) and through Chenoa (1.1 miles). The map record here holds separately mapped pieces of the route between south of Shirley and Chenoa, about 20 miles in all.

The northern end is unfinished. In 2024 the county was awarded a $675,000 federal RAISE grant to plan and design the final nine miles, between Lexington and the Livingston County line near Chenoa, which would complete a 47-mile trail across the county; the U.S. Department of Transportation withdrew that grant in September 2025. In October 2025 the Illinois Department of Transportation awarded the county $1.875 million for engineering, environmental review and design of the remaining nine miles. At that point the county was still seeking money to build it.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Normal 4ne, 3.6 km from the trail's middle, 2 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F333850637483868479665038
Low °F161928385060636153423121
Precipitation, in2.422.63.74.84.14.13.83.23.52.82.3
Snow, in7.55.52.20.50000000.83.6
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1926 Normal sheet (1:62,500); the 1958 Peoria sheet (1:250,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

2 Reddit threads about this trail, Jul 2025 to Sep 2025

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9773348, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Official trail website · Official site · checked Oct 31, 2026
  3. McLean County's Historic Route 66 Trail | McLean County, IL - Official Website · government source · checked Oct 14, 2026
    Supports: designated section of the Constitution Trail, highway segments for non-motorized use plus local roads and off-road trail, segment list and lengths, partner municipalities
  4. Following Sorensen's Advocacy, McLean County Receives Funding to Extend Historic Route 66 Trail | Representative Eric Sorensen · government source · checked Oct 14, 2026
    Supports: $675,000 2024 RAISE grant to plan and design final nine miles between Lexington and the Livingston County line near Chenoa; 47-mile trail on completion
  5. Route 66 bike trail construction gets a boost with IDOT grant — WMBD via Yahoo News · web · checked Oct 14, 2026
    Supports: October 2025 IDOT grant of $1.875 million for engineering, environmental review and design; RAISE grant withdrawn in September 2025

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.