Roy Orr Trail
Greenway in Texas
Runs through DeSoto · Dallas County
Conditions now
Loading the weather near DeSoto…
Forecast by the National Weather Service for DeSoto · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Roy Orr Trail is a 3.6-mile, 8-foot-wide concrete trail along Ten Mile Creek through the central part of DeSoto, Texas, in Dallas County. The City of DeSoto calls it the main component of its trail system. It connects neighborhoods to the DeSoto Town Center, Murphy Hills Park and Ernie Roberts Park.
The city divides the trail into five sections, from west to east: Mirkes Parkway to the Town Center (1.60 miles), the Town Center to Polk Street (0.80 miles), Polk Street to Meadows Parkway (0.59 miles), Meadows Parkway to Plantation (0.17 miles), and Plantation to Murphy Hills Park (0.44 miles). Parking is available at the eastern end at Murphy Hills Park. OpenStreetMap maps about 2.6 miles of the trail in three pieces, with several bridges over Tenmile Creek and crossings of Hampton Road, Pleasant Run Road, Polk Street, The Meadows Parkway and Plantation Drive; the rest of the city's 3.6 miles is not yet on the map line.
An extension is planned at the Creeks of Homestead development. In June 2025 Wildwood Development registered a project at 2023 North Westmoreland Road with the Texas Department of Licensing and Regulation for the construction of an extension of the Roy Orr Trail, with an estimated cost of $3.5 million and a construction window from January 2025 to January 2026. The state filing still showed the project as registered, so its completion could not be confirmed.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
32% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Dallas Redbird Airport, 8.8 km from the trail's middle, 33 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 57 62 69 76 84 91 96 96 89 79 67 59 Low °F 38 41 48 55 64 72 75 75 68 58 47 39 Precipitation, in 2.5 2.6 3.6 3.7 4.3 3.9 1.9 1.8 3 4.5 2.8 3.1 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Dallas sheet (1:125,000); the 1959 Lancaster sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Pleasant Run Hike and Bike Trail 1.5 mi away · 1.8 mi, paved
- Runyon Creek Trail 4.3 mi away · 2.8 mi, paved
- Balcones Trail 4.8 mi away · 4.7 mi, paved
- Red Oak Creek Trail 4.8 mi away · 3.3 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Facilities • Roy Orr Trail — City of DeSoto · government source · checked Oct 15, 2026 Supports: main component of the DeSoto trail system, 3.6 miles, 8 feet wide, concrete, along Ten Mile Creek through the central city, connections to Town Center, Murphy Hills Park and Ernie Roberts Park, five trail sections and their lengths
- Creeks of Homestead - Trails (TABS2025020261) — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026 Supports: June 2025 registration by Wildwood Development, 2023 North Westmoreland Road, extension of the Roy Orr Trail, $3,500,000 estimate, January 2025 to January 2026 dates, status Project Registered, Dallas County
- Roy Orr Trail | Texas Trails — TrailLink · web · checked Oct 15, 2026 Supports: parking at the eastern end at Murphy Hills Park
- Roy Orr Trail (way 506871352 and connected ways) — OpenStreetMap · web · checked Oct 15, 2026 Supports: mapped length about 2.6 miles in three pieces, bridges over Tenmile Creek, crossings of Hampton Road, Pleasant Run Road, Polk Street, The Meadows Parkway and Plantation Drive
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.