States › Michigan

Saint Ignace Trout Lake Trail

Rail-trail in Michigan

Runs through Trout Lake Township, Moran Township, Brevort Township and St. Ignace Township · Chippewa and Mackinac counties

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Managed by Michigan DNR Parks and Recreation Division.2

Length
25.5 mi 41.0 km1
Surface
Dirt1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Church Road mile 16.6 directions to trailhead 1
Trout Lake, MI (opens in a new tab)
Trout Lake, MI · Photo: TCP04 · CC BY 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The St. Ignace–Trout Lake Trail is a 26-mile multi-use trail in Michigan's Upper Peninsula, built on a section of the former roadbed of the Duluth, South Shore and Atlantic Railway. It links St. Ignace, near the northern end of the Mackinac Bridge, with the community of Trout Lake, giving a route off the highways between the Straits of Mackinac and the interior of the peninsula. Most of the corridor lies within the Hiawatha National Forest, and the trail is open to off-road vehicles as well as to cyclists and hikers.

From St. Ignace the trail shares its first 5 miles with the North Country Trail, then the two separate and the rail-trail continues north on the old grade across Mackinac County, past Chain Lake, Moran, the Fred Dye Nature Sanctuary and Ozark, into Chippewa County. At Trout Lake the right-of-way returns to active railroad use and the trail ends. TrailLink lists the endpoints as Little Bear Sports Park at 275 Marquette Street in St. Ignace and South Wegwas Drive in Trout Lake. Moran has a gas station and groceries.

The surface is dirt and gravel. The trail is popular with snowmobilers in winter, and off-road vehicles and motorcycles use it in other seasons. Cyclists' reports on TrailLink between 2018 and 2026 describe loose gravel, potholes, sand and water running across the trail in places, a surface suited to mountain bikes; the corridor is remote and crosses Forest Service roads.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

37% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Moran, 6.4 km from the trail's middle, 5 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F262837486272777668554232
Low °F7715283948545446362716
Precipitation, in2.21.623.12.52.93.23.33.94.23.42.6
Snow, in20.414.89.86.8000000.47.421.3
Old maps

USGS topographic maps of the trail's middle go back to the 1954 Sault Sainte Marie sheet (1:250,000); the 1964 Kenneth sheet (1:24,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Michigan DNR Statewide Railtrails, Michigan · Government dataset · Michigan DNR dataset notice on DNRTrailsOPENDATA: "a public record ... no restrictions on the use, reproduction, or distribution of this dataset", as is, no warranty · checked Oct 31, 2026
    “managing_org from Michigan DNR Statewide Railtrails”
  3. St. Ignace–Trout Lake Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: 26-mile ORV, bicycle and hiking trail; former Duluth, South Shore and Atlantic Railway roadbed; St. Ignace near north end of the Mackinac Bridge to Trout Lake; first five miles shared with the North Country Trail; Mackinac and Chippewa counties; Chain Lake, Moran, Fred Dye Nature Sanctuary, Ozark; right-of-way resumes active rail use at Trout Lake
  4. St. Ignace to Trout Lake Trail — TrailLink · web · checked Oct 14, 2026
    Supports: almost entirely within Hiawatha National Forest; endpoints Little Bear Sports Park (275 Marquette St.) and S Wegwas Dr.; dirt and gravel surface; popular with snowmobilers; Moran gas station and groceries; user reviews 2018–2026 on surface conditions, ORVs and motorcycles, Forest Service road crossings

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.