Sawmill Bike Path
Greenway in California
In El Dorado County
Conditions now
Loading the weather near Meyers…
Forecast by the National Weather Service for Meyers · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Sawmill Road mile 0.3 directions to trailhead 1
- Parking at Sawmill Road mile 0.5 directions to trailhead 2
- Parking at Sawmill Road mile 0.7 directions to trailhead 3
- Parking at Sawmill Road mile 1.2 directions to trailhead 4
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Sawmill Bike Path is a paved Class I bicycle and pedestrian path along Sawmill Road just south of South Lake Tahoe, in El Dorado County, California. El Dorado County built it as part of a walking and bicycling effort that began in 2005, and its Sawmill 2 Bike Path and Erosion Control Project put the path on the south side of Sawmill Road between U.S. Highway 50 and Lake Tahoe Boulevard, together with erosion control and water quality work; the California Transportation Commission approved the project in December 2014.
The path was built in phases. The original Sawmill path, 0.68 mile long, was joined by a final 1.18 miles along Sawmill Road, which opened with a ribbon cutting on October 14, 2015. This record maps about 1.9 miles of that Sawmill Road path, from Highway 50 northwest to Lake Tahoe Boulevard near South Tahoe High School. South of Highway 50, an earlier Sawmill phase built in 2007 and 2008 runs beside the Lake Tahoe Golf Course to the Pat Lowe Memorial Bike Path, built in 1992 at the junction of Highways 50 and 89 in Meyers; at the north end the network meets the Lake Tahoe Boulevard path, completed in 2012. Together these form a multi-use route of about six miles between Meyers and South Lake Tahoe.
The path is an asphalt, eight-foot-wide multi-use trail. Three local families donated easements across their property for it, and partners included California State Parks, the U.S. Forest Service, the Tahoe Regional Planning Agency, the California Tahoe Conservancy, Caltrans, the Washoe Tribe and the Lake Tahoe Bicycle Coalition.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
33% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
South Lake Tahoe Airport, 3.3 km from the trail's middle, 5 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 43 43 48 53 62 72 80 80 73 62 51 43 Low °F 18 19 24 28 33 38 42 41 35 29 23 18 Precipitation, in 2.8 3.8 2.9 1.3 1.3 0.6 0.4 0.4 0.3 1.4 1.9 3.5 - Old maps
USGS topographic maps of the trail's middle go back to the 1889 Pyramid Peak sheet (1:125,000); the 1955 Emerald Bay sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Lake Tahoe Boulevard Bike Path within 0.2 mi · 1.7 mi, paved
- South Tahoe Bikeway 2.3 mi away · 7.3 mi, paved
- Dennis T. Machida Memorial Greenway 3.3 mi away · 1.8 mi, paved
- Al Tahoe Bike Path 4.0 mi away · 1.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Sawmill 2 Bike Path & Erosion Control Project, Notice of Determination — CEQAnet, Governor's Office of Land Use and Climate Innovation · government source · checked Oct 16, 2026 Supports: El Dorado County as lead agency, Class 1 bicycle facility on the south side of Sawmill Road between U.S. Highway 50 and Lake Tahoe Boulevard, erosion control and water quality work, California Transportation Commission approval December 2014
- Meyers connects to South Lake Tahoe with Class 1 bike trail (October 14, 2015) — South Tahoe Now · web · checked Oct 16, 2026 Supports: ribbon cutting October 14, 2015, effort begun in 2005, eight-foot-wide multi-use path, final 1.18 miles along Sawmill Road joining the original 0.68-mile path, South Tahoe High School at Lake Tahoe Boulevard, 2007/2008 phase beside the Lake Tahoe Golf Course, Pat Lowe Memorial Bike Project of 1992 at the Highway 50 and 89 junction, 2012 phase and Lake Tahoe Boulevard project, six-mile total, donated easements, partner agencies
- OpenStreetMap way named Sawmill Bike Path — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: mapped extent of about 1.9 miles along Sawmill Road from Highway 50 to Lake Tahoe Boulevard, asphalt surface, bicycle designation
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.