Seaboard Coastline Trail
Rail-trail in South Carolina
In Charleston County
Conditions now
Loading the weather near Meggett…
Forecast by the National Weather Service for Meggett · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Jehossee Island Road mile 0.6 directions to trailhead 1
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Seaboard Coastline Trail is a gravel and dirt track on an abandoned railbed in the Edisto Unit of the Ernest F. Hollings ACE Basin National Wildlife Refuge, in Charleston County, South Carolina, managed by the U.S. Fish and Wildlife Service. The name comes from OpenStreetMap, whose mapping of the refuge's trails cites the Fish and Wildlife Service; OpenStreetMap tags the railbed as a former Seaboard Air Line Railroad line. The Seaboard extended its Charleston line south to Savannah between 1915 and 1917, opening it on December 31, 1917, and abandoned the section between Charleston and Lobeco in 1967, after its merger with the Atlantic Coast Line.
This record maps about 1.3 miles of the railbed, in a straight line through the refuge, with an access point on Jehossee Island Road, a gravel state road. The track is closed to motor vehicles and open to people on foot and on bicycles. It belongs to the Edisto Unit's network of about 25 miles of dirt roads and rice-field dikes that the refuge opens to foot and bicycle traffic on a seasonal basis.
The refuge is open daily from sunrise to sunset. Its regulations allow bicycles, and Class 1 electric bicycles with motors under 750 watts, on refuge roads and in walk-in areas. The refuge is hunted in season, and the Fish and Wildlife Service asks visitors to check current regulations and authorized activities with the refuge manager.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
83% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: October to May. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Edisto Is Middleton Plantation, 9.6 km from the trail's middle, 1 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 59 63 69 76 83 88 90 90 85 78 68 61 Low °F 40 42 48 56 64 71 74 74 69 60 49 43 Precipitation, in 3.6 2.9 3.9 3.5 2.8 5.2 6.5 7.5 5.2 4.3 2.6 3.9 - Wildlife refuges
Passes through Ernest F. Hollings Ace Basin National Wildlife Refuge.
- Old maps
USGS topographic maps of the trail's middle go back to the 1919 Edisto Island sheet (1:62,500); the 1960 Fenwick sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain); National Wildlife Refuge System boundaries (U.S. Fish and Wildlife Service) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Hiking — Ernest F. Hollings ACE Basin National Wildlife Refuge (U.S. Fish and Wildlife Service) · government source · checked Oct 16, 2026 Supports: about 25 miles of dirt roads and rice-field dikes on the Edisto Unit open to foot and/or bicycle traffic on a seasonal basis
- Ernest F. Hollings ACE Basin National Wildlife Refuge Public Use Regulations, and General Hunting and Fishing Permit 2026-2027 — U.S. Fish and Wildlife Service · government source · checked Oct 16, 2026 Supports: open daily from legal sunrise to legal sunset; bicycles and Class 1 e-bikes under 750 watts permitted on refuge roads and in walk-in areas; hunting seasons on the Edisto Unit; contact the refuge manager for current regulations
- East Carolina Line — Wikipedia · organization · checked Oct 16, 2026 Supports: Seaboard Air Line extension from Charleston to Savannah built 1915-1917, opened December 31, 1917; abandoned between Charleston and Lobeco by October 1967 after the merger with the Atlantic Coast Line
- Seaboard Coastline Trail (way 133109977) — OpenStreetMap · web · checked Oct 16, 2026 Supports: name; gravel track on an abandoned railway tagged as former Seaboard Air Line (SAL); closed to motor vehicles, open to foot and bicycle; mapping source FWS; inside the ACE Basin National Wildlife Refuge; Jehossee Island Road (State Road S-10-346, gravel, Charleston County) at the access point; record length of about 1.3 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.