Seaside Rail Trail
Rail-trail in Massachusetts · OpenStreetMap relation
Runs through North Plymouth and Plymouth · Plymouth County
Conditions now
Loading the weather near North Plymouth…
Forecast by the National Weather Service for North Plymouth · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Water Lot 4 mile 0 directions to Water Lot 4
- Parking at Water Street mile 0.1 directions to trailhead 2
- Parking at Water Street mile 0.2 directions to trailhead 3
- Parking at Nelson Street mile 0.3 directions to trailhead 4
- Parking at Hedge Road mile 1.2 directions to trailhead 5
(opens in a new tab) About this trail
The Seaside Rail Trail, also called the North Plymouth Rail Trail or Sea Side Trail, is a rail trail of about 1.2 miles along the shore of North Plymouth, Massachusetts, between Nelson Memorial Park, just north of Plymouth's harbor and downtown, and the Cordage Park commercial area. It is owned by the Town of Plymouth. It follows the Old Colony Railroad's line to Plymouth, a 36.8-mile line from Boston that opened in 1845; the New York, New Haven and Hartford Railroad took control in 1893 under a 99-year lease, and year-round passenger service ended around 1959. The MBTA restored commuter rail to the line in the 1990s, and this final section was converted to a trail in the 2010s, partly with Community Preservation Act funds.
From the Hedge Road parking lot near Cordage Park, the trail heads south along the shore past the Holmes Reservation, which it borders, and a public beach. A 0.2-mile side trail climbs to a cliff overlooking the ocean, and the route passes salt marsh, open field, sandy beach and thicket, with views of Plymouth Beach and Kingston Bay. It ends at the Nelson Memorial Park lot, beside a beach and summer splash pad; a sandy path continues about 0.1 mile to Water Street.
The North and South Rivers Watershed Association describes the trail as mostly paved and accessible; a local guide describes stretches of paved path alternating with packed gravel, and old rails still in the ground. Parking is at Nelson Memorial Park, Cordage Park, the end of Hedge Road, the Holmes Reservation and along Atlantic Avenue. The trail is free and open dawn to dusk to walkers and cyclists, with dogs on leash.
Sources checked Oct 13, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- The railroad
The Federal Railroad Administration's national rail map marks 85% of this route as a trail on former railroad right-of-way.
- Shade
36% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September and November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Plymouth-Kingston, 2 km from the trail's middle, 8 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 41 43 49 59 69 78 84 82 76 65 55 46 Low °F 22 23 29 38 48 58 64 63 57 46 36 28 Precipitation, in 4.8 4.2 5.8 4.7 3.7 3.8 3.5 3.6 4.3 5 4.4 4.9 Snow, in 10.1 11.5 8.5 1 0 0 0 0 0 0 0.1 6.7 - Old maps
USGS topographic maps of the trail's middle go back to the 1886 Plymouth sheet (1:62,500); the 1950 Plymouth sheet (1:24,000) shows the area at mid-century. Browse all 20 maps in topoView.
Sources: North American Rail Network Lines (Federal Railroad Administration / BTS NTAD) (CC0 1.0); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Historic Railway
The line in its working days, from copies of old photographs, oldest first.
Photo 1 of 2
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 12461908, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- North Plymouth Rail Trail — North and South Rivers Watershed Association · organization · checked Oct 13, 2026 Supports: about 1.2 miles from Nelson Memorial Park to Cordage Park; owned by the Town of Plymouth; Old Colony line history 1845, 1893 lease, end of service around 1959, MBTA 1990s, converted in the 2010s with CPA funds; habitats and views; 0.2-mile cliff side trail; borders Holmes Reservation; mostly paved, ADA accessible; parking; dawn to dusk, free, walking and biking, dogs leashed
- Sea Side Trail — Hiking Trails of Plymouth (South Shore Hiking Trails) · web · checked Oct 13, 2026 Supports: Seaside Rail Trail and Sea Side Trail names; Hedge Road lot; public beach at Holmes Reservation; paved and packed gravel stretches; rails in the ground; Nelson Playground beach and splash pad; sandy path 0.1 mile to Water Street
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.

