Shady Brook Trail
Greenway in Texas · OpenStreetMap relation
Runs through Plano · Denton and Collin counties
Conditions now
Loading the weather near Plano…
Forecast by the National Weather Service for Plano · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Managed by City of Plano.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
(opens in a new tab) About this trail
The Shady Brook Trail is a concrete hike and bike trail in west Plano, Texas, owned by the City of Plano Parks and Recreation Department. The city describes Shady Brook Trail as a greenbelt park with a hike/bike trail and open sports practice fields, which are used on a first-come, first-served basis. It is part of the city's trail system.
TrailLink lists the trail at 2.5 miles, running between Kings Manor Lane and 6301 Midway Road. At its eastern end, at Midway Road, it connects to the Bluebonnet Trail; a rider's review on TrailLink notes that the Bluebonnet Trail in turn reaches the Legacy Trail. The same review describes the route as running mostly behind homes near a creek. The record's map line covers about 2.3 miles, with short spurs to nearby streets, and OpenStreetMap shows a bridge and an underpass along it.
The surface is concrete. TrailLink notes that there is no designated parking for the trail. In 2019 the city rebuilt a section at Woodland Creek Drive: between June and August it removed and replaced the existing trail, made drainage improvements and poured 550 linear feet of new concrete trail, at an estimated cost of $100,000, according to the project's registration with the Texas Department of Licensing and Regulation.
Sources checked Oct 15, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
24% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Richardson, 12.3 km from the trail's middle, 22 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 56 60 69 75 83 90 94 95 87 78 66 57 Low °F 36 40 48 55 64 71 75 74 67 56 46 38 Precipitation, in 2.8 3.4 3.6 3.5 5.2 3.8 2.2 2.5 3.3 5.3 3 3.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1929 Frisco sheet (1:62,500); the 1960 Hebron sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Bluebonnet Trail within 0.2 mi · 11.0 mi, paved
- Arbor Hills Loop 0.9 mi away · 1.3 mi, paved
- Memorial Drive Trail 1.1 mi away · 1.9 mi, paved
- Park Loop Trail (The Colony) 1.3 mi away · 2.9 mi, paved
- Legacy Trail 2.0 mi away · 5.1 mi, paved
- Blue Trail (Carrollton) 3.1 mi away · 6.8 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 16152776, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Shady Brook Trail — City of Plano, TX · government source · checked Oct 15, 2026 Supports: greenbelt park with a hike/bike trail and open sports practice fields, first come, first served
- Shady Brook Trail Repair at Woodland Creek Drive (TABS2019005151) — Texas Department of Licensing and Regulation · government source · checked Oct 15, 2026 Supports: owner City of Plano Parks and Recreation Department; 2019 repair at Woodland Creek Drive, June to August 2019, drainage improvements, 550 linear feet of concrete trail, $100,000 estimate
- Shady Brook Trail — TrailLink · web · checked Oct 15, 2026 Supports: 2.5 miles, endpoints Kings Manor Ln. and 6301 Midway Rd., concrete, part of the Plano trails system, connection to Bluebonnet Trail at the east end, no designated parking; review: behind homes near a creek, Bluebonnet Trail leads to Legacy Trail
- Shady Brook Trail (relation 16152776) — OpenStreetMap · web · checked Oct 15, 2026 Supports: map line about 2.3 miles with spurs, bridge and underpass, operator City of Plano
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.