States › Missouri

Shuyler Creek Trail

Greenway in Missouri

Runs through Republic · Greene County

Conditions now

Loading the weather near Republic…

Forecast by the National Weather Service for Republic · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Official website

Length
2.4 mi 3.9 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West Farm Road 182 mile 2.4 directions to trailhead 1
Wilson's Creek National Battlefield, beside the trail (opens in a new tab)
Wilson's Creek National Battlefield, beside the trail · Photo: Hog Farm · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Shuyler Creek Trail, which Ozark Greenways calls the Shuyler Creek Greenway, is a multi-use trail in east Republic, Missouri, managed and maintained by the City of Republic. It is part of the Ozarks Transportation Organization's Regional Trail Study and is meant to link Republic to the regional trail system. Ozark Greenways describes the original trail as three-quarters of a mile long, suburban in character and lined by residential lots, with picnic tables and benches.

In April 2020 the city received $394,214 in design and right-of-way funds to extend the trail nearly 2 miles to Wilson's Creek National Battlefield. On October 1, 2024, the Republic City Council awarded the construction contract to JD Wallace Contracting of Springfield, for no more than $2,091,982.16, paid with Transportation Alternative Program money and the city's Capital Improvement Sales Tax; work was to start that fall and finish by spring 2025. The extension runs from the trail's eastern end near East Lee and Kentwood streets along West Farm Road 182 to a point near State Highway ZZ inside the battlefield, and the city manager said it would also connect to Republic High School. Early plans drew homeowner fears of condemnation, and the city remapped the route to avoid it.

OpenStreetMap now maps about 2.4 miles, including the section along Farm Road 182, with parking off West Farm Road 182. For the original section, Ozark Greenways directs visitors to park on the west side of the Walmart at 1150 US Highway 60 and walk the sidewalk to the corner of Hines and Cherrywood streets. The trail is open to walkers, runners, bicyclists, in-line skaters and wheelchairs; motor vehicles are not allowed.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

5% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Springfield, 13.6 km from the trail's middle, 15 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F445059687685908981705747
Low °F242836465665696759473628
Precipitation, in2.52.43.54.75.64.53.93.64.33.63.62.6
Snow, in4.43.320.10000000.63.3
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1884 Springfield sheet (1:125,000); the 1960 Republic sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Shuyler Creek Greenway — Ozark Greenways · organization · checked Oct 15, 2026
    Supports: City of Republic as manager, OTO Regional Trail Study, three-quarter-mile original trail, picnic tables and benches, suburban setting, April 2020 design and right-of-way funds, planned extension to Wilson's Creek National Battlefield, parking and access directions, permitted uses, no motor vehicles
  3. Republic approves contract for Shuyler Trail Extension — KSMU (October 2, 2024) · organization · checked Oct 15, 2026
    Supports: October 1, 2024 contract award, contractor, cost cap, TAP and CIST funding, construction schedule, extension route along W. Farm Road 182 to near Highway ZZ, connection to Republic High School, condemnation concerns and remapping
  4. Shuyler Creek Trail parking off West Farm Road 182 — OpenStreetMap · web · checked Oct 15, 2026
    Supports: mapped length about 2.4 miles including the Farm Road 182 section, parking off West Farm Road 182

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.