Signal Ditch Trail
Greenway in Colorado · OpenStreetMap relation
Runs through Thornton · Adams County
Conditions now
Loading the weather near Thornton…
Forecast by the National Weather Service for Thornton · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Signal Ditch Trail is a concrete trail in Thornton, Adams County, that follows the Signal Ditch, an irrigation channel. COTREX, the state trail map run by Colorado Parks and Wildlife, lists it at 3.3 miles under the City of Thornton and places it in Fallbrook Farms Park; this record maps about 2.5 miles of it. COTREX shows the ditch itself running about 11 miles through Northglenn, Thornton and Todd Creek.
TrailLink gives the endpoints as 128th Avenue, where the trail picks up from the north end of the Farmers' High Line Canal Trail, and 141st Drive. The route passes suburban housing and neighborhood open space, including Lake Village Park, Cherrywood Park, Fallbrook Park and Fallbrook Farm Park. At York Street it meets the Lee Lateral Ditch Trail, which heads east, and parking is at the Lake Village Parkway lot where the trail crosses York Street.
COTREX records about 3.25 miles of concrete and a short paved stretch, at elevations of 5,229 to 5,270 feet. The trail is open to walkers, leashed dogs and bicycles and closed to horses and motor vehicles.
Sources checked Oct 17, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Northglenn, 7.4 km from the trail's middle, 47 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 48 50 58 64 72 85 91 89 82 67 56 48 Low °F 19 20 28 35 44 53 59 57 49 37 27 19 Precipitation, in 0.5 0.5 1.2 1.9 2.4 1.5 1.7 1.3 1.2 1.1 0.7 0.5 Snow, in 6 7.6 8.2 6.5 1.2 0 0 0 0.1 2.4 6.9 5.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1890 East Denver sheet (1:125,000); the 1957 Eastlake sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Lee Lateral Ditch Trail within 0.2 mi · 2.0 mi, paved
- Ditch Trail within 0.2 mi · 3.4 mi, paved
- Mid-Town Trail within 0.2 mi · 3.6 mi, paved
- Brantner Gulch Trail 0.7 mi away · 4.8 mi, paved
- Park Village Trail 0.7 mi away · 1.4 mi, paved
- Horizon Tributary Trail 1.3 mi away · 2.6 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 20800665, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Signal Ditch Trail — COTREX (Colorado Parks and Wildlife) · government source · checked Oct 17, 2026 Supports: 3.3-mile length, City of Thornton manager, Fallbrook Farms Park, concrete mileage, elevation range, allowed uses
- Signal Ditch — COTREX (Colorado Parks and Wildlife) · government source · checked Oct 17, 2026 Supports: ditch length and the communities it runs through
- Signal Ditch Trail — TrailLink · web · checked Oct 17, 2026 Supports: irrigation channel, Adams County, endpoints, Farmers' High Line Canal Trail connection, parks along the route, Lee Lateral Ditch Trail junction, York Street parking, non-motorized use
- OpenStreetMap relation 20800665 — OpenStreetMap contributors · web · checked Oct 17, 2026 Supports: mapped route and length
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.