Silver Bow Creek Greenway
Greenway in Montana · OpenStreetMap relation
Runs through Butte · Silver Bow County
Conditions now
Loading the weather near Butte-Silver Bow (balance)…
Forecast by the National Weather Service for Butte-Silver Bow (balance) · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at McDonald's Drive Through mile 4.4 directions to trailhead 1
- Parking at Santa Claus Road mile 6.2 · restrooms directions to trailhead 2
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Silver Bow Creek Greenway is a multi-use trail along Silver Bow Creek west of Butte, Montana, in Silver Bow and Deer Lodge counties. Rails to Trails Conservancy lists 10.2 miles open in two segments: 5.7 miles from Butte to Ramsay, and 4.5 miles from Durant Canyon Road near Finlen to the Highway 1 Rest Area in Stuart. A multijurisdictional Greenway Service District with representatives from both counties oversees it.
The creek was heavily contaminated by decades of mining and smelting. The state received $23 million in Natural Resource Damage grant funds from a settlement with Atlantic Richfield Company, used for creek restoration, trail construction, access features and easements. Construction began in 2005 and continues. One mile was added between Fairmont Road and Hackney in 2022, and two more miles to the Highway 1 rest area in 2023.
This record covers a paved 6.1-mile stretch west of Butte, with mapped access points at McDonald's Drive Through and at Santa Claus Road, where restrooms are mapped.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
2% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Butte Bert Mooney Airport, 11.1 km from the trail's middle, 39 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 32 35 44 51 61 70 81 80 69 54 40 31 Low °F 8 10 19 26 34 41 46 44 36 27 16 7 Precipitation, in 0.4 0.4 0.6 1.3 2 2.5 1.2 1.3 1.1 0.8 0.6 0.5 - On the National Register
- Butte, Anaconda and Pacific Railway Historic District, Anaconda · historic district, listed 1988 · nomination file for Butte, Anaconda and Pacific Railway Historic District
- Ramsay Historic District, Butte · historic district, listed 1988 · nomination file for Ramsay Historic District
- Old maps
USGS topographic maps of the trail's middle go back to the 1889 Helena sheet (1:250,000); the 1959 Butte North sheet (1:62,500) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- RedditSearch Reddit: r/Montana
Nearby trails
- Butte, Anaconda and Pacific Hill Trail within 0.2 mi · 4.3 mi, surface unknown
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9511503, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Great American Rail-Trail in Montana — Rails to Trails Conservancy · organization · checked Oct 18, 2026 Supports: 10.2 miles, two segments, $23 million settlement, 2005 start, 2022 and 2023 additions, service district
- OpenStreetMap · web · checked Oct 18, 2026 Supports: OSM data: relation 9511503, paved, about 6.1 miles, access points
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.