States › Texas

Sims Bayou Greenway

Greenway in Texas

Runs through Houston · Harris County

Conditions now

Loading the weather near Houston…

Forecast by the National Weather Service for Houston · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
19.5 mi 31.3 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Blue Ridge Drive mile 0.2 directions to trailhead 1
  2. Parking at Blue Ridge Drive mile 0.2 directions to trailhead 2
  3. Parking at Simsbrook Drive mile 2.1 directions to trailhead 3
  4. Parking at Simsbrook Drive mile 4.5 directions to trailhead 4
  5. Parking at Brisbane Street mile 8.6 directions to trailhead 5
  6. Parking at Airport Boulevard mile 9.2 directions to trailhead 6
  7. Parking at Airport Boulevard mile 11.5 directions to trailhead 7
  8. Parking at Bellfort Street mile 14.9 · water directions to trailhead 8
  9. Parking at Bellfort Street mile 15.2 directions to trailhead 9
  10. Parking at Telephone Road mile 15.5 directions to trailhead 10
  11. Parking at Reveille Street mile 15.7 directions to trailhead 11
  12. Parking at Oak Vista Street mile 16 directions to trailhead 12
  13. Parking at Broadway Street mile 16.5 directions to trailhead 13
  14. Parking at Broadway Street mile 16.6 directions to trailhead 14
  15. Parking at River Drive mile 16.9 directions to trailhead 15
  16. Parking mile 19.4 directions to trailhead 16
Sims Bayou Greenway (opens in a new tab)
Photo: microsoft · CC BY-SA 4.0 · Mapillary

About this trail

The Sims Bayou Greenway is a hike-and-bike trail along Sims Bayou in south Houston, Texas. It is one of the nine bayous in Bayou Greenways, a public-private partnership of the nonprofit Houston Parks Board, the City of Houston and the Houston Parks and Recreation Department, carried out with the Harris County Flood Control District. When complete, the greenway is to run nearly 20 miles, with 10-foot-wide concrete trails, from Blue Ridge County Park near Hillcroft Avenue to Milby Park. This record maps about 19.5 miles of trail between those two parks.

In May 2022 the Parks Board finished a 1.4-mile segment from Glenbrook Park to Bellfort Avenue, which crosses Sims Bayou beside the Houston Botanic Garden on a refurbished pedestrian bridge. With earlier Bayou Greenways work reaching Milby Park to the east and a U.S. Army Corps of Engineers trail reaching Stuart Park to the west, the Parks Board then counted 14.9 miles of trail open along the bayou. The project added a trailhead at River Drive and the I-45 feeder road, neighborhood connections at Reveille Street, Telephone Road and Bellfort Avenue, and lighting under several road bridges. The Kinder Foundation has put more than $9 million into Sims Bayou as part of its $50 million gift to Bayou Greenways in 2013.

Hiking Project describes the route downstream from Blue Ridge Park at Hillcroft: a street-bridge crossing at Heatherbrook, a passage under State Highway 288 with a bridge to the Hill at Sims park, Margaret Jenkins Park, the sidewalk of the Airport Boulevard bridge, at-grade crossings of Cullen and Martin Luther King boulevards to Law Park, and a barrier-separated lane on Reed Road beside a separate pedestrian path. Past Stuart Park and Reveille Park the trail passes under Broadway and I-45, crosses the bayou at the Botanic Garden, skirts the Sims Bayou South wastewater plant and ends at Charles H. Milby Park.

Sources checked Oct 15, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Houston Hobby Airport, 8.5 km from the trail's middle, 1 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F646873798691939489827366
Low °F465056626975777773645448
Precipitation, in4.12.93.34.15.46.14.65.45.85.83.94.3
Old maps

USGS topographic maps of the trail's middle go back to the 1915 Park Place sheet (1:24,000); the 1955 Park Place sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Riders in May 2025 and March 2026 described Sims as lightly used compared with other Houston bayou trails; one 2025 rider found it more scenic than Brays Bayou, with fewer surface-street crossings. r/bikehouston, May 2025 · r/bikehouston, Mar 2026
  • In January 2025 one rider called the new Highway 288 underpass passable, with the east-side link unfinished; in March 2026 a rider said the detour around 288 could be skipped, even on road bikes. r/bikehouston, Jan 2025 · r/bikehouston, Mar 2026
  • In January 2024 one rider reported a new path around F.M. Law Park that avoided Mykawa Road, while another said part of the eastern trail was being dug up and rebuilt. r/bikehouston, Jan 2024
  • Riders in early 2026 said the Hill at Sims park and its bayou bridge had not opened yet; one saw signs already pointing people to the park, another saw construction looking nearly finished. r/bikehouston, Jan 2026 · r/bikehouston, Mar 2026
6 Reddit threads about this trail, Jan 2024 to Mar 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Sims Bayou — Houston Parks Board · organization · checked Oct 15, 2026
    Supports: 10-foot-wide concrete trails, nearly 20 miles from Blue Ridge County Park near Hillcroft Avenue to Milby Park upon completion
  3. Construction Complete on New Segment of Sims Bayou Greenway — Houston Parks Board press release (May 2, 2022) · organization · checked Oct 15, 2026
    Supports: 1.4-mile segment Glenbrook Park to Bellfort Avenue, refurbished pedestrian bridge by the Houston Botanic Garden, Milby Park and USACE trail to Stuart Park, 14.9 miles open, new trailhead at River Drive and I-45 feeder, neighborhood connections, lighting under road bridges, Kinder Foundation $9 million of its $50 million 2013 gift, Bayou Greenways partnership of nine bayous with Harris County Flood Control District
  4. Sims Bayou Greenway — Hiking Project · web · checked Oct 15, 2026
    Supports: route description from Blue Ridge Park at Hillcroft to Milby Park: Heatherbrook crossing, Hwy 288 underpass and Hill at Sims, Margaret Jenkins Park, Airport Blvd bridge sidewalk, Cullen and MLK crossings to Law Park, Reed Road separated lane and pedestrian path, Stuart and Reveille parks, Broadway and I-45 underpass, Botanic Garden crossing, Sims Bayou South WWTP, Charles H. Milby Park

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.