Slippery Elm Trail
Rail-trail in Ohio · OpenStreetMap relation
Runs through Bowling Green, Portage, Rudolph and North Baltimore · Wood County
Conditions now
Loading the weather near Rudolph…
Forecast by the National Weather Service for Rudolph · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
The Slippery Elm Trail is a rail to trail conversion in Wood County, Ohio that runs 13 miles from Bowling Green, through Portage and Rudolph, to North Baltimore, Ohio.
From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.
- Length
- 13.1 mi 21.0 km1
- On former railbed
- 12.0 mi 92%
- Opened
- 19953
- Surface
- Paved1
- Last checked
- Oct 31, 2026
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Sand Ridge Road mile 0 · restrooms directions to trailhead 1
- Parking at West Gypsy Lane Road mile 0.7 directions to trailhead 2
- Parking at West Main Street mile 2.8 · restrooms · water directions to trailhead 3
- Slippery Elm Trail Parking Area mile 5 · restrooms · water directions to Slippery Elm Trail Parking Area
- Parking at Mermill Road mile 5 · restrooms · water directions to trailhead 5
- Parking at North Beecher Street mile 12.8 directions to trailhead 6
- Parking at East Broadway Street mile 13.1 · restrooms · water directions to trailhead 7
(opens in a new tab) About this trail
The Slippery Elm Trail is a 13-mile paved rail-trail in Wood County, Ohio, running from Bowling Green through Portage and Rudolph to North Baltimore. The Wood County Park District, which maintains it, opened the trail in 1995.
The corridor began with the Bowling Green Railroad Company, founded in 1874 as a spur linking Bowling Green to the Cincinnati, Hamilton and Dayton Railway northwest of the city at Tontogany. The CH&D gained control of the Bowling Green line in 1887, and in 1890 the company absorbed the stretch that forms today's trail, then called the Toledo, Findlay and Springfield Railroad. The Baltimore and Ohio Railroad bought the line in 1917 and operated it until 1978. The trail's northern end is at Sand Ridge Road in Bowling Green, and within the city it connects with the Black Swamp Preserve Trail and the Kenwood Trail; trailheads are in Bowling Green, Portage, Rudolph and North Baltimore, and the route passes Rudolph Savanna, Cricket Frog Cove and the Black Swamp Preserve.
In June 2026 the trail received its first complete resurfacing since it was built, after decades of patching and crack sealing. An Ohio Department of Transportation Transportation Alternatives Program grant of $1,092,804, awarded in 2025 as one of 44 projects in 33 Ohio counties, covered about 80 percent of the cost of an overlay of about an inch and a half along the full length. Gerken Paving began at Sand Ridge Road and worked south, and the full 13 miles was to be ready for riders and walkers by the end of June 30, 2026.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Hoytville 2 NE, 10.2 km from the trail's middle, 3 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 33 36 47 60 72 81 84 82 77 64 50 38 Low °F 18 21 29 39 51 60 63 61 53 43 33 25 Precipitation, in 2.4 1.9 2.4 3.4 4 3.3 4.1 3.8 2.9 2.9 2.6 2.4 Snow, in 7.8 4.5 3.8 0.9 0 0 0 0 0 0 1 5 - Old maps
USGS topographic maps of the trail's middle go back to the 1901 Bowling Green sheet (1:62,500); the 1958 Bowling Green South sheet (1:24,000) shows the area at mid-century. Browse all 7 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Agency noticesSlippery Elm Trail — Wood County Park District
- RedditSearch Reddit: r/Ohio
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9761462, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- “Slippery Elm Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
- Wikidata Q24061973, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
- Slippery Elm Trail — Wikipedia · organization · checked Oct 14, 2026 Supports: 13 miles from Bowling Green through Portage and Rudolph to North Baltimore; paved; maintained by the Wood County Park District; opened 1995; railroad history 1874–1978; trailheads; Rudolph Savanna, Cricket Frog Cove, Black Swamp Preserve
- After 31 years of trail blazing in Wood County, Slippery Elm Trail gets first repaving — BG Independent News (June 30, 2026) · organization · checked Oct 14, 2026 Supports: first complete resurfacing since construction in 1995; earlier patching and crack sealing; Black Swamp Preserve Trail and Kenwood Trail connections; northernmost point at Sand Ridge Road; ODOT TAP grant of $1,092,804 awarded the previous year, one of 44 projects in 33 counties; about 80 percent of cost; about 1.5-inch overlay; Gerken Paving; full 13 miles ready by June 30, 2026
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.