Snapper Creek Trail
Greenway in Florida · OpenStreetMap relation
Runs through Westwood Lakes and Sunset · Miami-Dade County
Conditions now
Loading the weather near Sunset…
Forecast by the National Weather Service for Sunset · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.
No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Snapper Creek Trail is a paved path of about 3 miles along the Snapper Creek (C-2) Canal in the Kendall area of western Miami-Dade County, Florida. The canal right-of-way it uses is owned mainly by the South Florida Water Management District, which keeps it for flood control. Its existing sections began as Snapper Creek Linear Park, one of several paths built in the late 1980s under the linear-park design guidelines Metropolitan Dade County prepared in 1975.
TrailLink gives its ends as SW 117th Avenue at SW 41st Terrace and Snapper Creek Drive near SW 107th Avenue. From the north end the canal runs south beside SW 117th Avenue to North Snapper Creek Drive, then turns southeast along the south side of the drive, and the trail follows it. A buffer of trees, shrubs and palms separates much of the path from the roads.
A 2008 planning study, managed by the Miami-Dade County Park and Recreation Department and funded by the Miami-Dade Metropolitan Planning Organization, proposed a 5.6-mile Segment A from the C-4 Canal near Florida International University to Kendall Drive that takes in the existing path. It is part of a 9.4-mile greenway from the university to Dante B. Fascell Park near Red Road, first set out in the North Dade Greenways Master Plan adopted by the county commission in 1998. How much of that plan has since been built could not be confirmed. OpenStreetMap maps the path as asphalt with concrete stretches, designated for bicycles and pedestrians; July 2020 TrailLink reviews reported pavement broken up by tree roots. The record's map line measures about 2.5 miles.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
14% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: November to April. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Miami Nwsfo, 4.5 km from the trail's middle, 2 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 76 78 81 84 87 90 91 91 90 87 82 78 Low °F 58 61 63 67 71 75 76 76 76 72 66 62 Precipitation, in 2 2.2 2.3 3.4 6.4 10.4 8.7 10.8 9.3 8.4 3.4 2.4 - Old maps
USGS topographic maps of the trail's middle go back to the 1949 South Miami NW sheet (1:24,000); the 1955 South Miami NW sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Miller Drive Green and White Path within 0.2 mi · 4.7 mi, paved
- Merrick Trail 1.0 mi away · 3.6 mi, paved
- Central West Basin Linear Park 2.9 mi away · 1.5 mi, paved
- South Dade Trail 3.4 mi away · 19.9 mi, paved
- The Underline 3.5 mi away · 11.8 mi, paved
- Kitty Roedel Bicycle Path 3.6 mi away · 2.5 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap relation 9881954, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Snapper Creek Trail Segment A Planning Study (October 2008) — Miami-Dade TPO · organization · checked Oct 16, 2026 Supports: Snapper Creek (C-2) Canal; land owned primarily by SFWMD for flood control; 1975 Design Criteria and Guidelines for Linear Park Development and Snapper Creek Linear Park built in the late 1980s; existing sections within Segment A; canal runs south along SW 117th Avenue to North Snapper Creek Drive, then southeast along its south side; study managed by Miami-Dade County Park and Recreation Department and funded by the MPO; proposed 5.6-mile Segment A from the C-4 Canal near FIU to Kendall Drive; 9.4-mile greenway from FIU to Dante B. Fascell Park near Red Road; 1998 North Dade Greenways Master Plan adopted by the Board of County Commissioners
- Snapper Creek Trail — TrailLink (Rails-to-Trails Conservancy) · web · checked Oct 16, 2026 Supports: 3 miles; asphalt; Kendall; end points SW 117th at 41st Terrace and Snapper Creek Drive near 107th Ave.; buffer of trees, bushes and palms; July 2020 reviews on root-broken pavement
- Relation: Snapper Creek Trail (9881954) — OpenStreetMap · web · checked Oct 16, 2026 Supports: member ways (e.g. 710572601 asphalt, 710572628 concrete) mapped as cycleways designated for bicycles and pedestrians; record's mapped length of about 2.5 miles
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.