Length
3.5 mi 5.6 km1
On former railbed
2.5 mi 72%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Woodland Avenue mile 3.4 directions to trailhead 1
Bentleyville, along the trail (opens in a new tab)
Bentleyville, along the trail · Photo: Nyttend · Public domain · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Solon to Chagrin Falls Trail is an all-purpose trail in northeast Ohio linking the city of Solon with the existing Cleveland Metroparks trail toward Chagrin Falls. It follows the former Wheeling and Lake Erie Railroad corridor, which the City of Solon owns; the trail is owned by the city and managed by Cleveland Metroparks. In February 2022 Solon City Council took up a project development agreement and a lease and management agreement with Cleveland Metroparks for a proposed 4-mile hiking and biking trail, 2.1 miles of it in Solon, running from SOM Center Road through Bentleyville and Cleveland Metroparks to Chagrin Falls. Cleveland Metroparks says the project is funded by state grants of nearly $1.2 million together with City of Solon money.

Phase 1, completed in October 2025, begins at SOM Center Road, near Route 91 by Carter Lumber, and runs along the rail corridor to the Solon city boundary near the Deer Run cul-de-sac at the Solon–Bentleyville line, with an enhanced bicycle and pedestrian crossing at Liberty Road. Phase 2 is a 1,500-foot section on land Cleveland Metroparks already owns, linking the end of Phase 1 to the existing Metroparks trail at Chagrin River Road, which continues northeast to Chagrin Falls on an entirely off-road route. Cleveland Metroparks scheduled Phase 2 construction for 2026, after design and permitting; in August 2026 Hoodline reported completion targeted for 2027, after the state Controlling Board approved releasing $400,000 in fiscal 2026 capital funds for the trail.

The new trail is an accessible, 10-foot-wide paved path. Cleveland Metroparks lists the project length as 2 miles. Until Phase 2 is built, the Solon section and the trail at Chagrin River Road are not joined.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

47% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Kirtland-Holden 2, 25.6 km from the trail's middle, 40 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F343645586977828074624938
Low °F192028384958626155453525
Precipitation, in3.52.73.34.14.145.24.44.53.94.14.2
Old maps

USGS topographic maps of the trail's middle go back to the 1906 Chagrin Falls sheet (1:62,500); the 1953 Chagrin Falls sheet (1:24,000) shows the area at mid-century. Browse all 9 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Final Solon City Council Meeting: Solon to Chagrin Falls Trail — Bike Cleveland · organization · checked Oct 14, 2026
    Supports: February 22, 2022 council meeting on project development and lease and management agreements with Cleveland Metroparks; proposed 4-mile hiking and biking trail with 2.1 miles in Solon; route from SOM Center Road through Bentleyville and Cleveland Metroparks to Chagrin Falls along the former Wheeling & Lake Erie line
  3. Solon to Chagrin Falls Trail — Cleveland Metroparks · web · checked Oct 14, 2026
    Supports: Phase 1 from SOM Center Road to the Deer Run cul-de-sac near the Solon/Bentleyville line, completed October 2025; Phase 2 connects to the existing trail at Chagrin River Road, construction in 2026; 10-foot accessible paved all-purpose trail; existing Metroparks trail at Chagrin River Road runs northeast to Chagrin Falls off road; former Wheeling and Lake Erie Railroad corridor owned by the City of Solon; enhanced crossing at Liberty Road; nearly $1.2 million in state grants plus City of Solon funding; owned by Solon, managed by Cleveland Metroparks; remaining 1,500-foot section on Metroparks land; project length 2 miles
  4. Cleveland Metroparks rails-to-trails link to connect Solon, Chagrin Falls by 2027 — Hoodline (August 2026) · web · checked Oct 14, 2026
    Supports: starting point near Route 91 by Carter Lumber; completion targeted for 2027; Controlling Board release of $400,000 in fiscal 2026 capital funds

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.