States › Washington

South 277th Corridor Trail

Greenway in Washington

Runs through Kent · King County

Conditions now

Loading the weather near Kent…

Forecast by the National Weather Service for Kent · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.2 mi 3.5 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at 116th Avenue Southeast mile 0.1 directions to trailhead 1
South 277th Corridor Trail drawn on the 1949 USGS topographic map of Auburn, Washington
Then: the 1949 USGS Auburn sheet (1:24,000) with today's trail line. Generated from USGS and OpenStreetMap data: map public domain, line © OpenStreetMap contributors. The sheet at USGS.

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The South 277th Corridor Trail is a path along South 277th Street in Auburn, Washington. OpenStreetMap maps about 2.2 miles of paved path under this name. The City of Auburn's S 272nd/277th Street Corridor Capacity and Non-Motorized Trail Improvements project widened South 277th Street between Auburn Way North and L Street NE, and its title names non-motorized trail improvements along that corridor.

The city's 2022-2027 Capital Facilities Plan records the corridor widening as complete, with a ten-year environmental monitoring period that began in 2018 after final completion and runs through 2028. An Auburn Reporter notice from June 2017 reported closures of D Street NE, from 49th Street NE to South 277th Street, for the project's construction.

The same plan lists a proposed 0.83-mile Green River Trail connection from South 277th Street to the Reddington Levee Trail among the city's planned linear park additions.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

44% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Seattle Tacoma International Airport, 13.3 km from the trail's middle, 11 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F485054596671777872605247
Low °F383840434953575754474137
Precipitation, in5.83.84.23.21.91.40.611.63.96.35.7
Snow, in1.82.20.400000000.21.7
Old maps

USGS topographic maps of the trail's middle go back to the 1897 Tacoma sheet (1:125,000); the 1949 Auburn sheet (1:24,000) shows the area at mid-century. Browse all 8 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Capital Facilities Plan 2022-2027 - City of Auburn · government source · checked Oct 17, 2026
    Supports: S 272nd/277th St Corridor Capacity & Non-Motorized Trail Improvements project between Auburn Way North and L St NE; 10-year monitoring from 2018 final completion through 2028; proposed 0.83-mile Green River Trail from 277th to Reddington Levee Trail
  3. Auburn traffic advisory: D Street NE, 49th Street NE to South 277th Street - Auburn Reporter · web · checked Oct 17, 2026
    Supports: June 2017 closure of D Street NE from 49th Street NE to South 277th Street for the South 277th Street Corridor Capacity and Non-Motorized Trail Improvements project
  4. OpenStreetMap ways for this trail - OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: mapped length (about 2.2 miles) and paved surface

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.