South Fallsburg O&W Rail Trail
Rail-trail in New York
Runs through South Fallsburg and Fallsburg · Sullivan County
Conditions now
Loading the weather near South Fallsburg…
Forecast by the National Weather Service for South Fallsburg · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Dogpatch Trailhead mile 0 directions to Dogpatch Trailhead
- Willow Heights Trailhead mile 1.2 directions to Willow Heights Trailhead
(opens in a new tab) About this trail
The South Fallsburg Rail Trail is a 1.1-mile unpaved segment of the Sullivan O&W Rail Trail, a planned 50-mile multi-use trail on the former New York, Ontario and Western Railroad in Sullivan County, New York. Opened in 2024, it bypasses the Fallsburg Tunnel, a 1,123-foot brick tunnel built in 1886 that is closed to the public after several steel plates partially collapsed. Unlike most of the O&W trail it climbs moderately steep grades over Tunnel Hill, past a view of the tunnel's northwest portal and a picnic area. The main trailhead, with parking, is at Old Country Road and Dogpatch Road. A planned Town of Fallsburg bridge over the Neversink River would connect more than 14 miles of the trail.
Sources checked Oct 14, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
83% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May, July and October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Liberty 1 NE, 14.9 km from the trail's middle, 84 m higher Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 30 33 41 55 66 74 79 77 70 58 47 35 Low °F 13 14 22 32 43 52 57 55 48 37 28 20 Precipitation, in 3.7 2.8 3.9 4.2 4.7 5.2 4.7 5.3 5.2 4.8 3.9 4.7 Snow, in 16.6 17.4 12.8 3.3 0 0 0 0 0 0.3 4.2 15.3 - Old maps
USGS topographic maps of the trail's middle go back to the 1909 Monticello sheet (1:62,500); the 1966 Woodridge sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Community
Where people who ride and look after this trail post: notices, conditions, work days.
- Trail organizationSullivan O&W Rail Trail Alliance
Nearby trails
- Sullivan O&W Rail Trail within 0.2 mi · 2.4 mi, dirt
- Hurleyville O&W Rail Trail 0.7 mi away · 7.0 mi, paved
- Woodridge O&W Rail Trail 0.8 mi away · 3.2 mi, gravel
- Mountaindale O&W Rail Trail 3.6 mi away · 0.9 mi, gravel
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Sullivan O&W Rail Trail Neversink Crossing — New York State Regional Economic Development Councils · government source · checked Oct 14, 2026 Supports: Town of Fallsburg, with Sullivan County, to build a bridge over the Neversink River completing a 14-plus-mile section of the 50-mile Sullivan O&W Rail Trail
- New Stretch of the Sullivan O&W Rail Trail Opens in South Fallsburg — Radio Catskill (August 21, 2024) · organization · checked Oct 14, 2026 Supports: new 1.1-mile trail opened in 2024, hilly and unpaved, Neversink River overlook, 50-mile Sullivan O&W Trail
- South Fallsburg Rail Trail — Sullivan O&W Rail Trail Alliance · web · checked Oct 14, 2026 Supports: name, 1.1 miles, unpaved, tunnel bypass, Fallsburg Tunnel 1,123 feet, brick, built 1886, partial collapse and no public access, moderately steep grades over Tunnel Hill to the northwest entrance, picnic area at the halfway point, trailheads at Old Country Road and Dogpatch Road and at 29 Skunk Hollow Road, planned Neversink River bridge
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.