States › California

Southside Bikeway

Rail-trail in California

Runs through Vacaville · Solano County

Conditions now

Loading the weather near Vacaville…

Forecast by the National Weather Service for Vacaville · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.2 mi 2.0 km1
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at California Drive mile 0 directions to trailhead 1
  2. Parking at Ivy Court mile 0.3 directions to trailhead 2
  3. Parking at Marshall Road mile 0.7 directions to trailhead 3
  4. Parking at Davis Street mile 1.2 directions to trailhead 4
  5. Parking at Davis Street mile 1.2 directions to trailhead 5
  6. Parking at Hume Way mile 1.3 directions to trailhead 6
Southside Bikeway near California Drive, May 2019.JPG (opens in a new tab)
Southside Bikeway near California Drive, May 2019.JPG · Photo: Pi.1415926535 · CC BY-SA 3.0 · Wikimedia Commons

About this trail

The Southside Bikeway is a paved rail-trail of about 1.2 miles in Vacaville, Solano County, California, connecting downtown with the city's southern neighborhoods near Al Patch Park. It follows a former Sacramento Northern Railway corridor. The Northern Electric railway completed a line from near Suisun to Vacaville in 1914, and in 1930 the Sacramento Northern connected at Creed to this 9-mile Vacaville Branch.

TrailLink gives the endpoints as Hume Way and Davis Street at the downtown end and California Drive, west of Al Patch Park, at the southern end. Between them the path crosses several streets, one at a signalized crossing, and near Eugene Padan Elementary School it meets the Alamo Creek Bikeway, which runs east and west along Alamo Creek. The Solano Transportation Authority includes the bikeway among its top ten bike rides in northeast Solano County, describing an easy, fully paved and shaded 3-mile out-and-back ride that links four parks.

OpenStreetMap shows asphalt along the path and a concrete bridge. Parking is at Al Patch Park on California Drive; from the park, the trail is a short walk west along the California Drive sidewalk.

Sources checked Oct 16, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

6% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: January to May and October to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Fairfield, 10.7 km from the trail's middle, 34 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F576266717885908987786657
Low °F404345485256585857524540
Precipitation, in4.753.31.50.70.2000.11.12.55.4
Snow, in000000000000
Old maps

USGS topographic maps of the trail's middle go back to the 1908 Vacaville sheet (1:62,500); the 1953 Elmira sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Top Ten Bike Rides, Northeast Solano County (rev. 2025) — Solano Transportation Authority · government source · checked Oct 16, 2026
    Supports: Southside Bikeway as an easy, fully paved, shaded 3-mile out-and-back ride connecting four parks
  3. Rail transportation in Solano County, California — Wikipedia · organization · checked Oct 16, 2026
    Supports: Northern Electric line from near Suisun to Vacaville completed in 1914; Sacramento Northern connection at Creed to the 9-mile Vacaville Branch in July 1930
  4. Southside Bikeway — Visit Vacaville · web · checked Oct 16, 2026
    Supports: connects downtown Vacaville via a former Sacramento Northern Railway corridor to southern neighborhoods near Al Patch Park, crossing of the Alamo Creek Bikeway near Eugene Padan Elementary School, parking at Al Patch Park on California Drive and walk west to the trail
  5. Southside Bikeway — TrailLink · web · checked Oct 16, 2026
    Supports: 1.25 miles, endpoints Hume Way and Davis St. and California Dr. west of Al Patch Park, asphalt
  6. OpenStreetMap ways named Southside Bikeway — OpenStreetMap contributors · web · checked Oct 16, 2026
    Supports: asphalt surface, concrete bridge, signalized crossing, abandoned railway tagged as Sacramento Northern, mapped length of about 1.2 miles

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.