States › West Virginia

Southside Trail

Rail-trail in West Virginia

Runs through Oak Hill · Fayette County

Conditions now

Loading the weather near Thurmond…

Forecast by the National Weather Service for Thurmond · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
5.7 mi 9.2 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

None mapped yet. Trailheads come from OpenStreetMap trailhead and parking points within about 400 feet of the trail; add one there and it appears after the next weekly data build.

Plan your visit

Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS); National Park Service boundaries.

Once an old railroad grade, the Southside Trail provides an easy graded route for bikes. (bbf2dd19-aa95-48ab-aa96-db44df1d3ceb).jpg (opens in a new tab)
Once an old railroad grade, the Southside Trail provides an easy graded route for bikes. (bbf2dd19-aa95-48ab-aa96-db44df1d3ceb).jpg · Photo: NPS photo/Dave Bieri · Public domain · Wikimedia Commons

About this trail

The Southside Trail is a 7-mile trail in New River Gorge National Park and Preserve, West Virginia, managed by the National Park Service. It follows an abandoned railroad line along the New River and passes the sites of Rush Run, Red Ash and Brooklyn, mining towns that were once busy communities. The park service rates it easy and lists it for hiking and biking.

Bicycles were allowed on the trail under a park special regulation that took effect at the end of January 2014 and opened about 65 miles of existing trail in what was then the New River Gorge National River to riding. The Southside Trail, at 7.0 miles, was among the trails named.

The trailhead is at the Cunard River Access, reached from Fayetteville by Route 16 and Gatewood Road, where there is parking and a vault toilet. The first mile from Cunard is open to motor vehicles, and a parking area at Brooklyn marks the end of the maintained road. Remnants of railroad track lie beside the trail through the forest.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

86% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Bluestone Lake, 38.6 km from the trail's middle, 104 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F424656687682858479685645
Low °F252733425160646457453428
Precipitation, in3.12.93.73.74.63.94.23.63.12.62.43.2
Snow, in65.52.90.2000000.10.14
Old maps

USGS topographic maps of the trail's middle go back to the 1891 Raleigh sheet (1:125,000); the 1969 Thurmond sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

1 Reddit thread about this trail, May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Southside Trail — New River Gorge National Park & Preserve (U.S. National Park Service) · government source · checked Oct 14, 2026
    Supports: 7.0 miles one way; easy; hiking and biking; riverside trail on an abandoned railroad line; Rush Run, Red Ash and Brooklyn mining towns; Cunard River Access trailhead with parking and vault toilet; directions via Route 16 through Fayetteville and Gatewood Road; first mile open to motor vehicles; Brooklyn parking at end of maintained road; railroad track ruins
  3. Special Regulation Allowing Bicycle Use on NPS Trails to go into Effect — New River Gorge National Park & Preserve (U.S. National Park Service) · government source · checked Oct 14, 2026
    Supports: December 2, 2013 release: regulation effective by end of January 2014; about 65 miles of existing trail in the New River Gorge National River opened to bicycles; Southside Trail (7.0 mi) listed

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.