States › Ohio

Stark Electric Railway Trail

Trolley trail in Ohio · OpenStreetMap relation

Runs through Canton · Stark County

Conditions now

Loading the weather near Canton…

Forecast by the National Weather Service for Canton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
1.3 mi 2.0 km1
Surface
Surface unknown1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Mahoning Road Northeast mile 0 directions to trailhead 1
  2. Parking at Ellis Avenue Northeast mile 0.1 directions to trailhead 2
  3. Parking at Gilbert Avenue Northeast mile 0.2 directions to trailhead 3
  4. Parking at Avalon Avenue Northeast mile 0.5 directions to trailhead 4
  5. Parking at Avalon Avenue Northeast mile 0.5 directions to trailhead 5
  6. Parking at Mahoning Road Northeast mile 0.7 directions to trailhead 6
  7. Parking at Mahoning Road Northeast mile 1.3 directions to trailhead 7
Canton, along the trail (opens in a new tab)
Canton, along the trail · Photo: WeaponizingArchitecture · CC BY-SA 4.0 · Wikimedia Commons

No photo of the trail itself yet. Ridden it? Add yours.

About this trail

The Stark Electric Railway Trail is a paved urban trail of 1.2 miles along Mahoning Road NE in Canton, Ohio, managed by Stark Parks, the Stark County park district. It follows the route of the former Stark Electric Railway, a trolley line that ran on 33 miles of track between Canton and Salem by way of Louisville, Alliance, Sebring, Damascus and Beloit. Construction began in 1900 between Alliance and Canton, and the line reached Salem in August 1904. The railway's assets were sold at auction in June 1939 for $70,100, the last car ran between Canton and Salem on July 16, 1939, and motor buses replaced the service.

The trail runs along Mahoning Road between Hilscher Avenue and Kirby Avenue, on both the east and west sides of Harmont Avenue; 1.3 miles are mapped here. It combines cement sidewalk and asphalt and is lined with ginkgo, crabapple, maple, hawthorn and honey locust trees. SARTA bus stops sit along the route.

The trail is open 24 hours for bicycling and walking. Stark Parks notes that there is no defined trailhead or parking area.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

3% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Akron Canton Regional Airport, 14.1 km from the trail's middle, 35 m higher
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F363948627280848376635140
Low °F202229405059636255443426
Precipitation, in2.92.43.23.94.14.44.13.63.53.33.12.9
Snow, in13.4127.61.7000000.33.38.9
Old maps

USGS topographic maps of the trail's middle go back to the 1901 Canton sheet (1:62,500); the 1958 Canton East sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 14996485, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. Stark Electric Railway Trail — Stark Parks · web · checked Oct 14, 2026
    Supports: 1.2-mile paved urban trail along Mahoning Rd. NE in Canton; follows the route of the former Stark Electric Railway trolley; between Hilscher Ave. and Kirby Ave. on both sides of Harmont Ave.; cement sidewalk and asphalt; ginkgo, crabapple, maple, hawthorn and honey locust trees; SARTA bus stops; open 24 hours; biking and hiking; no defined trailhead or parking area
  3. Life on the Stark Electric Railway — Farm and Dairy (May 12, 2005) · web · checked Oct 14, 2026
    Supports: 33 miles of track between Canton and Salem via Louisville, Alliance, Sebring, Damascus and Beloit; construction began 1900 between Alliance and Canton; reached Salem August 19, 1904; last trip Canton–Salem July 16, 1939; replaced by motor buses; assets sold at auction June 1939 for $70,100

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.