State Route 99 Corridor Bikeway
Greenway in California
Runs through Chico · Butte County
Conditions now
Loading the weather near Chico…
Forecast by the National Weather Service for Chico · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Humboldt Road mile 3.8 directions to trailhead 1
- Parking mile 4.1 directions to trailhead 2
- Parking mile 4.2 directions to trailhead 3
- Parking mile 4.3 directions to trailhead 4
- Business Lane Parking mile 4.7 directions to Business Lane Parking
- Parking at Baney Lane mile 4.8 directions to trailhead 6
- Parking at Baney Lane mile 4.8 directions to trailhead 7
- Parking at Parkway Village Drive mile 4.8 directions to trailhead 8
- Parking at Parkway Village Drive mile 4.9 directions to trailhead 9
- Parking at Forest Avenue mile 5 directions to trailhead 10
- Parking at Forest Avenue mile 5 directions to trailhead 11
- Parking at Forest Avenue mile 5.2 directions to trailhead 12
- Parking at Forest Avenue mile 5.2 directions to trailhead 13
- Parking at Forest Avenue mile 5.3 directions to trailhead 14
- Butte College Skyway Center Parking mile 5.6 directions to Butte College Skyway Center Parking
- Parking at Skyway Road mile 5.6 directions to trailhead 16
Plan your visit
- By trainAmtrak: Chico, CA (CIC) 1.8 mi from the trail · Amtrak’s bike information
Links checked Oct 18, 2026. Sources: Amtrak stations (USDOT BTS).
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The State Route 99 Corridor Bikeway, known as Bikeway 99, is a bicycle corridor of about 7 miles in Chico, Butte County, California. It runs mostly along State Route 99 and serves as the north-south spine of the city's bicycle network, linking CSU Chico, Butte College's Chico Center, Fairview High School, Lower Bidwell Park, Chico Community Park, the Chico MarketPlace and North Valley Plaza. The City of Chico built it in phases from 2010: Phases 1 through 3 between 2010 and 2015, paid for with American Recovery and Reinvestment Act and federal air-quality (CMAQ) grants, and Phase 4, a 0.8-mile Class I path that replaced bike lanes and a signed route, finished in 2020.
The corridor mixes separated Class I paths with painted bike lanes and signed street routes, changing type about a dozen times, and its Class I sections pass under SR 99 and over Little Chico Creek on undercrossings and bridges. Phase 5, built by the city with Caltrans, added a Class I bridge over East 20th Street and a gap-closing path on the east side of the freeway, linking both sides of 20th Street and Business Lane; assembly of its steel arch began in January 2025, and the city held a grand opening for the bridge on September 24, 2025. That $23.8 million phase drew on state Active Transportation Program, CMAQ and local funds, and the city describes the finished corridor as a continuous route from Eaton Road to Skyway.
This record maps about 3.3 miles of off-street path in pieces: about 0.9 mile in north Chico, and a run of about 2 miles from Humboldt Road southeast past Business Lane and Forest Avenue to Skyway near Butte College's Skyway Center. A February 2024 city chapter on the bikeway notes frequent complaints about pavement condition and older sections marked only with plain Bike Route signs.
Sources checked Oct 16, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
11% tree cover along the route: open. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: February to May and October to December. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Oroville Municipal Airport, 32 km from the trail's middle, 7 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 55 60 66 72 81 90 96 94 89 78 64 55 Low °F 40 42 45 48 55 61 65 64 59 52 44 40 Precipitation, in 5.2 4.8 3.3 1.8 1.1 0.3 0 0 0.2 1.4 2.9 4.6 - Old maps
USGS topographic maps of the trail's middle go back to the 1891 Chico sheet (1:125,000); the 1950 Chico sheet (1:24,000) shows the area at mid-century. Browse all 10 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Sacramento Northern Railway 0.6 mi away · 1.4 mi, paved
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- 5. Bikeway 99 (chapter, February 2024) — City of Chico · government source · checked Oct 16, 2026 Supports: name Bikeway 99, about 7 miles, runs along SR 99 as the spine of the network, destinations served, phases 1-3 in 2010-2015 with ARRA and CMAQ funding, Phase 4 0.8-mile Class I path completed 2020, mix of Class I/II/III changing about a dozen times, undercrossing of SR 99 and bridge over Little Chico Creek, Phase 5 scope, pavement complaints and older sections with plain Bike Route signs
- SR-99 Corridor Bikeway Facility Phase 5 — City of Chico · government source · checked Oct 16, 2026 Supports: Phase 5 built with Caltrans, Class I overcrossing of East 20th Street and gap closure on the east side of SR 99, link between both sides of East 20th Street and Business Lane, grand opening September 24, 2025, continuous route from Eaton Road to Skyway of nearly 7 miles, ATP and CMAQ funding
- Chico advances SR-99 Bikeway Facility Project; arch bridge assembly starts January 2025 — KRCR · web · checked Oct 16, 2026 Supports: $23.8 million project, steel arch assembly from January 6, 2025, funding of $5.6 million local, $5.8 million CMAQ and $12.4 million ATP
- OpenStreetMap ways named State Route 99 Corridor Bikeway — OpenStreetMap contributors · web · checked Oct 16, 2026 Supports: mapped extent of about 3.3 miles in pieces, north Chico piece, run from Humboldt Road past Business Lane and Forest Avenue to Skyway, Butte College Skyway Center parking
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.