Sue Clancy Greenway
Greenway in Tennessee
Runs through Knoxville · Knox County
Conditions now
Loading the weather near Knoxville…
Forecast by the National Weather Service for Knoxville · Forecast at weather.gov
Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.
Start and end distances run along the mapped line from the mapped point nearest you, whichever way you are riding. The trailhead distance is straight-line.
Trailheads
- Parking at Carol Road mile 0.3 · restrooms directions to trailhead 1
- Parking at Jenkins Road Northeast mile 0.6 directions to trailhead 2
(opens in a new tab) No photo of the trail itself yet. Ridden it? Add yours.
About this trail
The Sue Clancy Greenway is a city greenway in the Fountain City area of Knoxville, Tennessee, running inside 38-acre Adair Park. Hoodline reports that it formerly ended at a creek, leaving walkers and cyclists with no safe way past the traffic where Broadway meets Interstate 640. It is named for Sue Clancy, described there as Knoxville's first director of special events.
The Adair Park / Sue Clancy Greenway Extension links Adair Park and the neighborhoods north of the I-640 and Broadway intersection with neighborhoods south of Sharp's Ridge, along Lynnhurst Creek. Legacy Parks Foundation says the extension serves pedestrians and cyclists and negotiated easements across Knoxville Utilities Board, Berry Lynnhurst Funeral Home and Lynnhurst Cemetery land. City crews built it, and the city maintains it, as a 10-foot-wide gravel or crushed-stone path, with paving planned later. Groundbreaking was November 17, 2025, and Hoodline reports the opening in August 2026. Legacy Parks gives the extension as a half-mile; Hoodline also calls it a mile.
Sources checked Oct 18, 2026 · CC BY 4.0
History and riding conditions
From federal and state maps, matched to the trail's mapped line.
- Shade
54% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.
- When to ride
Best months: May and September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.
Monthly normals, 1991–2020
Knoxville Exp Stn, 13.6 km from the trail's middle, 46 m lower Normal Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec High °F 48 52 61 71 78 86 88 88 83 72 61 51 Low °F 26 29 36 44 54 62 66 65 59 46 35 30 Precipitation, in 5.2 5.1 5.3 5.2 4.5 4 5.8 3.4 4.1 3 4.1 5.9 - Old maps
USGS topographic maps of the trail's middle go back to the 1897 Maynardville sheet (1:125,000); the 1953 Fountain City sheet (1:24,000) shows the area at mid-century. Browse all 13 maps in topoView.
Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.
Nearby trails
- Pleasant Ridge Greenway 3.1 mi away · 1.5 mi, paved
- Middlebrook Pike Greenway 3.8 mi away · 2.1 mi, paved
- Victor Ashe Greenway 3.8 mi away · 1.6 mi, paved
- Neyland Greenway 4.1 mi away · 3.6 mi, paved
- Third Creek Greenway 4.3 mi away · 4.0 mi, paved
- SoKno Rail Trail 4.5 mi away · 3.4 mi, dirt
Take it with you
Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.
Something wrong?
Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.
Sources
- OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
- Legacy Parks Helps Secure Key Easements for the Adair Park / Sue Clancy Greenway Extension - Legacy Parks Foundation · organization · checked Oct 18, 2026 Supports: route, pedestrians and cyclists, easements, half-mile, city build and maintenance, gravel path, paving plan, groundbreaking date
- Fountain City's dead-end trail finally connects past I-640 bottleneck - Hoodline · web · checked Oct 18, 2026 Supports: existing greenway ended at creek, August 2026 opening, namesake, Adair Park size, crushed stone, mile-long figure
- Groundbreaking on Adair Park / Sue Clancy Greenway extension is Wednesday - Knox TN Today · web · checked Oct 18, 2026 Supports: half-mile length, Lynnhurst Creek, City Public Service crews, planned paving
Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.