States › New Jersey

Sussex Branch Trail

Rail-trail in New Jersey · OpenStreetMap relation

Runs through Branchville, Frankford Township, Ross Corner, Lafayette Township, Newton, Andover Township, Andover and Byram Township · Sussex County

Conditions now

Loading the weather near Newton…

Forecast by the National Weather Service for Newton · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Sussex Branch Trail is a rail trail in New Jersey, United States, with a total length of 20 miles (32 km).

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Official website

Length
17.4 mi 28.0 km1
On former railbed
14.3 mi 82%
Surface
Gravel1
Last checked
Oct 31, 2026

Trailheads

  1. Parking mile 4.3 directions to trailhead 1
  2. Parking mile 4.6 · restrooms directions to trailhead 2
  3. Parking at Route 94 mile 4.8 directions to trailhead 3
  4. Parking at Route 94 mile 4.9 directions to trailhead 4
  5. Parking at Warbasse Junction Road mile 5.7 directions to trailhead 5
  6. Parking at Warbasse Junction Road mile 8 directions to trailhead 6
  7. Parking at Stickles Pond Road mile 9.4 directions to trailhead 7
  8. Parking at Goodale Road mile 11.3 directions to trailhead 8
  9. Parking at Goodale Road mile 11.3 directions to trailhead 9
  10. Parking mile 12.5 directions to trailhead 10
  11. Parking mile 12.6 directions to trailhead 11
  12. Parking at Lindley Court mile 12.8 directions to trailhead 12
  13. Parking at Lindley Court mile 12.9 directions to trailhead 13
  14. Parking mile 12.9 directions to trailhead 14
  15. Parking mile 12.9 directions to trailhead 15
  16. Parking mile 12.9 directions to trailhead 16
  17. Parking mile 13.1 directions to trailhead 17
  18. Parking mile 13.1 directions to trailhead 18
  19. Parking mile 13.2 directions to trailhead 19
  20. Parking at Lenape Road mile 13.3 directions to trailhead 20
  21. Parking at Smith Street mile 13.4 directions to trailhead 21
  22. Parking at Smith Street mile 13.4 directions to trailhead 22
  23. Parking at Lenape Road mile 13.4 directions to trailhead 23
  24. Parking at Brighton Avenue mile 13.4 directions to trailhead 24
  25. Parking at Smith Street mile 13.4 directions to trailhead 25
  26. Parking at Tamarack Road mile 15.6 directions to trailhead 26
  27. Parking at Tamarack Road mile 15.6 directions to trailhead 27
  28. Parking at South Shore Road mile 16.2 directions to trailhead 28
  29. Sussex Branch Parking mile 18.1 · restrooms directions to Sussex Branch Parking
Sussex Branch Trail, Allamuchy Mountain State Park, NJ - railway cutting.jpg (opens in a new tab)
Sussex Branch Trail, Allamuchy Mountain State Park, NJ - railway cutting.jpg · Photo: Zeete · CC BY-SA 4.0 · Wikimedia Commons

About this trail

The Sussex Branch Trail is a rail-trail of about 20 miles in Sussex County, New Jersey, running from Allamuchy Mountain State Park in Byram Township north to Mill Street in Branchville. It is managed by the New Jersey Division of Parks and Forestry and crosses Kittatinny Valley State Park, which the division operates. The trail follows the former Sussex Railroad, which began as the Sussex Mine Railroad, chartered on March 9, 1848, to haul iron ore from the Andover Mine; its first line, 11 miles of 3-foot gauge built between 1849 and 1851, was worked by mules. The company became the Sussex Railroad in 1853, opened a standard-gauge line between Newton and Waterloo on December 11, 1854, and reached Branchville in 1869. The Delaware, Lackawanna and Western Railroad bought a controlling interest in 1881, and the last train ran on October 2, 1966. The state acquired the right-of-way in two transactions, in 1979 and 1982.

The Byram section, about 3.5 miles, starts at a parking lot on Waterloo Road (County Road 604) across from Continental Drive. Farther north the trail crosses Kittatinny Valley State Park and reaches Warbasse Junction, just north of Newton, where the Paulinskill Valley Trail meets it. South of Branchville, the 3.5-mile Great Valley Rail Trail in Augusta also connects.

The surface is mostly cinder, with stretches of gravel, ballast, grass and dirt, and the trail is open year round to walking, biking, horseback riding and cross-country skiing. Portions are wheelchair accessible, and there are parking areas along the route. Railroad remains include graded fills, cuts through bedrock such as the Slate Cut, underpasses built for farm equipment and cattle, an underpass beneath the Pequest Fill south of Andover, an overpass carrying the Morris and Sussex Turnpike, and bridges over the Pequest River and the Paulins Kill.

Sources checked Oct 14, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

63% tree cover along the route: shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: April to June and August to October. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Andover Aeroflex Airport, 3.6 km from the trail's middle, 8 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F363948617179848274635241
Low °F192028384857626052423225
Precipitation, in3.32.84.13.83.84.55.14.84.34.63.44.2
Old maps

USGS topographic maps of the trail's middle go back to the 1888 Franklin sheet (1:62,500); the 1954 Newton East sheet (1:24,000) shows the area at mid-century. Browse all 12 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Historic Railway

The line in its working days, from copies of old photographs, oldest first.

Branchville, 1917: Station and tracks
Branchville, 1917: Station and tracksPhoto: Unknown author · Public domain · Wikimedia Commons (opens in a new tab)

Community

What riders say on Reddit

  • In July 2025 two people raised road crossings as the trouble spot: one recalled difficult Route 206 crossings from an earlier visit, the other found the Newton area rough, citing numerous county highway crossings. r/newjersey, Jul 2025
  • In May 2026 one commenter called the trail wooded, unpaved and rocky and poor for running, though unsure it was the right trail; another, who had walked sections, said running was fine without pavement. r/newjersey, May 2026
3 Reddit threads about this trail, Jun 2024 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 9759590, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Sussex Branch Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q16985195, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Official trail website · Official site · checked Oct 31, 2026
  5. Trails » Sussex Branch - Byram Section — Byram Township · organization · checked Oct 14, 2026
    Supports: managed by the NJ Division of Parks and Forestry, mule-drawn mine railroad, Byram section about 3.5 miles, Waterloo Road (County Road 604) trailhead across from Continental Drive, uses
  6. Sussex Railroad — Wikipedia · organization · checked Oct 14, 2026
    Supports: March 9, 1848 charter, Andover Mine, 11-mile 3-foot-gauge line 1849-1851, 1853 renaming, Newton-Waterloo opening December 11, 1854, Branchville extension 1869, DL&W controlling interest 1881, last train October 2, 1966
  7. Sussex Branch Trail — Wikipedia · organization · checked Oct 14, 2026
    Supports: about 20 miles, Allamuchy Mountain State Park to Branchville, 1979 and 1982 acquisitions, surface, open year round, Slate Cut, Pequest Fill underpass, Morris and Sussex Turnpike overpass, Pequest and Paulinskill bridges, Warbasse Junction and Paulinskill Valley Trail, Great Valley Rail Trail
  8. Kittatinny Valley State Park — Wikipedia · organization · checked Oct 14, 2026
    Supports: park operated by the NJ Division of Parks and Forestry, cinder base and uses, fills, bedrock cuts, farm and cattle underpasses, wheelchair-accessible areas
  9. Sussex Branch Trail — Sussex County Skylands · web · checked Oct 14, 2026
    Supports: Mill Street in Branchville endpoint, multiple parking areas, portions wheelchair accessible

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.