States › Mississippi

Tanglefoot Trail

Rail-trail in Mississippi · OpenStreetMap relation

Runs through New Albany, Ecru, Pontotoc, Algoma, New Houlka and Houston · Union, Pontotoc and Chickasaw counties

Conditions now

Loading the weather…

Forecast by the National Weather Service · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

The Tanglefoot Trail is an asphalt-covered rail trail in northeastern Mississippi. Ranging 43.6 miles (70.2 km) in the right-of-way of the Ripley and New Albany Railroad, it is the longest rail-trail in the state. It runs through three counties and is located within the Mississippi Hills National Heritage Area.

From Wikipedia2 (CC BY-SA). Help improve the article and it improves here.

Official website

Length
43.6 mi 70.2 km1
Opened
20133
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at West Reynolds Street mile 18.5 directions to trailhead 1
  2. Parking at North College Street mile 18.5 directions to trailhead 2
  3. Parking at West Reynolds Street mile 18.5 directions to trailhead 3
  4. Parking at North College Street mile 18.6 directions to trailhead 4
  5. Parking at North College Street mile 18.6 directions to trailhead 5
  6. New Houlka Whistlestop Parking mile 33.8 directions to New Houlka Whistlestop Parking

Plan your visit

Links checked Oct 18, 2026. Sources: National Recreation Trails database (NPS and American Trails).

Ecru-Tanglefoot-Trail-ms.jpg (opens in a new tab)
Ecru-Tanglefoot-Trail-ms.jpg · Photo: Brian Stansberry · CC BY 4.0 · Wikimedia Commons

About this trail

The Tanglefoot Trail is a 43.6-mile asphalt rail-trail in northeast Mississippi, running through Union, Pontotoc and Chickasaw counties in the Mississippi Hills National Heritage Area. It is managed by the GM&O Rails-to-Trails Recreational District, named for the Gulf, Mobile and Ohio, the last railroad to run through the three counties. The corridor was assembled in part for Col. William Clark Falkner's Gulf and Ship Island Railroad beginning in 1871, and the trail takes its name from the Tanglefoot, a narrow-gauge engine used to build the line. In 2003 the Mississippi Tennessee Railroad gave notice of abandonment between New Albany and Houston. After a $5.1 million Mississippi Department of Transportation grant in 2008, the district bought the right-of-way for $1.45 million in July 2008, and a $4.5 million grant in August 2010 paid for paving the full length. The trail opened in September 2013, was designated a National Recreation Trail in 2015, and entered the Rails-to-Trails Conservancy's Rail-Trail Hall of Fame in 2019.

New Albany is the northern end and Houston the southern end, with Ecru, Pontotoc, Algoma and New Houlka between them. Whistle stops with parking and restrooms stand at Ingomar, Ecru, Algoma and New Houlka. The ten-foot-wide path passes hardwood forests, cotton and soybean fields, pastures and wetlands, and crosses King Creek, named for the Chickasaw leader Ishtehotopah, who lived near it.

The trail is open daily from 30 minutes before sunrise to 30 minutes after sunset unless otherwise posted. Class 1 and Class 2 e-bikes and electric golf-type carts are allowed; gasoline-powered vehicles and horses are not, dogs must be leashed, and children under 12 must be accompanied by an adult. Entry is permitted only at public roads, whistle stops and other points the district designates.

Sources checked Oct 18, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

Shade

38% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: September to November. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Pontotoc Exp Stn, 7.5 km from the trail's middle, 3 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F515664738087909085746354
Low °F313542506067706963514134
Precipitation, in4.95.65.56.15.54.94.953.74.24.36.3
Snow, in00.10.1000000000.1
On the National Register
Old maps

USGS topographic maps of the trail's middle go back to the 1956 Tupelo sheet (1:250,000); the 1958 Tupelo sheet (1:250,000) shows the area at mid-century. Browse all 6 maps in topoView.

Sources: National Register of Historic Places locations (National Park Service) (Public domain); Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Oct 18, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Community

What riders say on Reddit

  • Two commenters in May 2025 described the route differently: one said it opens to farmland beyond Ecru and advised sunscreen and water, another said it is mostly tree-lined from Pontotoc southward. r/mississippi, May 2025
  • Riders in 2025 and 2026 named meal stops: Latham's by the New Albany trailhead, the Algoma fish house, a soul food spot in Pontotoc, and taco trucks at times by Houston's trailhead. r/mississippi, May 2025 · r/mississippi, May 2026
  • Three people in 2025 reported wildlife on the trail: a large skink near Pontotoc, deer wandering near the Houston end, and horsefly swarms on one ride. r/mississippi, May 2025
4 Reddit threads about this trail, May 2025 to May 2026

What riders reported at the time, not checked by us. The threads belong to their authors; Reddit content and links are not covered by the site's CC BY license.

Where people who ride and look after this trail post: notices, conditions, work days.

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap relation 7902681, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. “Tanglefoot Trail”, Wikipedia · Encyclopedia · CC BY-SA 4.0 · checked Oct 31, 2026
  3. Wikidata Q40715432, Wikidata · Knowledge base · CC0 · checked Oct 31, 2026
  4. Official trail website · Official site · checked Oct 31, 2026
  5. Tanglefoot Trail — Wikipedia · organization · checked Oct 18, 2026
    Supports: National Recreation Trail designation in 2015, Rail-Trail Hall of Fame induction in 2019, ten-foot width, restrooms at the whistle stops
  6. Home — Tanglefoot Trail (GM&O Rails-to-Trails Recreational District) · web · checked Oct 18, 2026
    Supports: 43.6 miles, Mississippi Hills National Heritage Area, New Albany northern end and Houston southern end, Ecru, Pontotoc, Algoma and New Houlka between, managing district
  7. About the Tanglefoot — Tanglefoot Trail · web · checked Oct 18, 2026
    Supports: corridor assembled for the Gulf and Ship Island Railroad by Col. William Clark Falkner from 1871, asphalt surface, Union, Pontotoc and Chickasaw counties, forests, fields, pastures and wetlands, King Creek and Ishtehotopah, Tanglefoot narrow-gauge engine, September 2013 opening
  8. Who We Are — Tanglefoot Trail · web · checked Oct 18, 2026
    Supports: 2003 notice of abandonment by the Mississippi Tennessee Railroad, trail and district names (GM&O as last line through the three counties), $5.1 million MDOT grant in 2008, $1.45 million right-of-way purchase in July 2008, $4.5 million paving grant in August 2010, whistle stops at Ingomar, Ecru, Algoma and New Houlka, opening September 2013
  9. Rules & Regulations — Tanglefoot Trail · web · checked Oct 18, 2026
    Supports: hours, entry points, parking at whistle stops, e-bike and golf-cart rules, no petroleum vehicles or horses, leashed dogs, under-12 rule

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.