States › Washington

Tanner Trail

Greenway in Washington

Runs through North Bend · King County

Conditions now

Loading the weather near North Bend…

Forecast by the National Weather Service for North Bend · Forecast at weather.gov

Live from the National Weather Service, NOAA river gauges and the National Interagency Fire Center as this page opened. Advisories, not closure orders: follow the links for the agency's details.

Length
2.3 mi 3.7 km1
On former railbed
1.7 mi 74%
Surface
Paved1
Last checked
Oct 31, 2026

Trailheads

  1. Parking at Southeast 12th Street mile 0.3 · restrooms · water directions to trailhead 1
  2. Parking at Southeast 12th Street mile 0.3 · restrooms · water directions to trailhead 2
  3. Parking at Southeast North Bend Way mile 0.3 · restrooms · water directions to trailhead 3
  4. Parking at Southeast North Bend Way mile 0.9 directions to trailhead 4
  5. Parking at Southeast North Bend Way mile 1.5 directions to trailhead 5
  6. Parking at East North Bend Way mile 1.8 directions to trailhead 6
  7. Parking at Southeast Orchard Drive mile 1.9 directions to trailhead 7
  8. Parking at East North Bend Way mile 2 directions to trailhead 8
  9. Parking at East North Bend Way mile 2 directions to trailhead 9
  10. Parking at East North Bend Way mile 2 directions to trailhead 10
  11. Parking at East North Bend Way mile 2.1 directions to trailhead 11
  12. Parking at East North Bend Way mile 2.1 · restrooms directions to trailhead 12
  13. Parking at West Park Street mile 2.2 directions to trailhead 13
  14. Parking at Bendigo Boulevard North mile 2.3 directions to trailhead 14
  15. Parking at Sydney Avenue North mile 2.3 directions to trailhead 15
  16. Parking at Sydney Avenue North mile 2.3 directions to trailhead 16
  17. Parking at Bendigo Boulevard South mile 2.3 directions to trailhead 17
  18. Parking at West North Bend Way mile 2.3 directions to trailhead 18
  19. Parking at Bendigo Boulevard North mile 2.3 directions to trailhead 19
Tanner Trail (opens in a new tab)
Photo: natfoot · CC BY-SA 4.0 · Mapillary

About this trail

The Tanner Trail is a paved multi-use trail in North Bend, Washington, that runs parallel to North Bend Way. The corridor east of downtown is a former railroad right-of-way, and the city has looked to buy Burlington Northern Railroad's right-of-way there to extend the trail. The City of North Bend built the trail. OpenStreetMap maps about 2.3 miles of it, and flags about 1.7 miles as railbed.

The city's Tanner Trail project paved two sections through downtown, one between Main Street and Bendigo Boulevard and one between Park Street and Orchard Drive. Officials opened them in 2008, with nearly 95 percent of the $130,000 cost paid by grants. A 200-foot connection between the William H. Taylor Train Depot Park and Park Street followed in 2019, and a 400-foot extension of the eastern portion, with conduit laid for future lighting, was built in 2021.

The city plans to extend the trail east along North Bend Way to connect with the Snoqualmie Valley Trail. In March 2024 the city council approved a design contract for a 1.1-mile, 10-foot-wide asphalt extension, which the city had expected to start building in 2025. Whether that construction has begun is not confirmed here.

Sources checked Oct 17, 2026 · CC BY 4.0

History and riding conditions

From federal and state maps, matched to the trail's mapped line.

The railroad

Former Burlington Northern line. From Rail Lines of Washington State (WSDOT).

Shade

22% tree cover along the route: partly shaded. Tree canopy at 100 points along the trail, 2025 data.

When to ride

Best months: May to September. Months with normal highs of 55 to 85 °F, under an inch of snow and under 5 inches of precipitation.

Monthly normals, 1991–2020
Snoqualmie Falls, 8 km from the trail's middle, 11 m lower
NormalJanFebMarAprMayJunJulAugSepOctNovDec
High °F465054596469767770605146
Low °F363537404651545449443836
Precipitation, in8.65.86.75.343.11.21.236.29.58.4
Snow, in1.50.20.300000000.11.5
Old maps

USGS topographic maps of the trail's middle go back to the 1913 Cedar Lake sheet (1:125,000); the 1953 North Bend sheet (1:24,000) shows the area at mid-century. Browse all 5 maps in topoView.

Sources: Historical Topographic Map Collection (U.S. Geological Survey) (Public domain); NLCD Tree Canopy Cover (USDA Forest Service) (Public domain); U.S. Climate Normals 1991-2020 (NOAA National Centers for Environmental Information) (Public domain). Matched Nov 3, 2026. Map layers are approximate: a fact here is a lead to check, not a survey.

Nearby trails

Take it with you

Download GPX GeoJSON

Open data, ODbL. Attribute BikeTheRail and OpenStreetMap contributors.

Something wrong?

Closed section, wrong surface, missing piece? Tell us and a person will check it. Report a problem.

Sources

  1. OpenStreetMap ways for this trail, OpenStreetMap contributors · Map data · ODbL · checked Oct 31, 2026
  2. City unveils Tanner Trail project - Snoqualmie Valley Record · web · checked Oct 17, 2026
    Supports: 2008 opening of two paved sections (Main Street to Bendigo Boulevard; Park Street to Orchard Drive), $130,000 cost, nearly 95 percent grant-funded
  3. Two businesses make donations to improve Tanner Trail - Snoqualmie Valley Record · web · checked Oct 17, 2026
    Supports: 2021 400-foot eastern extension and conduit; 2019 200-foot connection to the depot park; trail runs parallel to North Bend Way; plan to reach the Snoqualmie Valley Trail
  4. Tanner Trail extension to connect with Snoqualmie Valley Trail - Snoqualmie Valley Record · web · checked Oct 17, 2026
    Supports: March 5, 2024 design contract; 1.1-mile 10-foot asphalt extension to the Snoqualmie Valley Trail replacing a railroad right of way; construction expected 2025
  5. North Bend proposes trail, parks expansion - Snoqualmie Valley Record · web · checked Oct 17, 2026
    Supports: city exploring buying Burlington Northern Railroad right of way by North Bend Way to extend the Tanner Trail
  6. OpenStreetMap ways for this trail - OpenStreetMap contributors · web · checked Oct 17, 2026
    Supports: mapped length (about 2.3 miles), paved surface, railbed length

Every fact above cites a numbered source and the date it was last checked; the list is rebuilt weekly. Know a better source? Add a reference.